The impact of supply chain management practice on construction project performance

Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.

Abstract

Construction supply chains encompass the flows of information, materials, labour, plant, equipment and temporary work, which originate from the different parties, viz., main contractors, suppliers, subcontractors and clients/architects. Any problems with these flows will eventually disrupt the project performance. The primary aim of this research was to gain a comprehensive understanding of the impact of supply chain management practice on construction project performance. The research methods adopted comprised: preliminary investigations, a main survey and the development of simulation models. The preliminary investigations were carried out by interviewing members of the construction industry and visiting two medium-sized building projects over a period of 6 months. The main survey was intended to collect data required for developing the simulation models. They were developed using Pertmaster Risk ExpertM software, which allows supply chain delays to be applied on a CPM network of a typical medium-sized building project of 300 days duration. The results of the simulation showed that when all work was carried out by the main contractor and all supply chain delays were applied, the project's median delay was 67 days (equivalent to 22% of the project duration). It was learnt that problems in material flow caused the biggest impact on the project, followed by labour flow, information flow, and `plant, equipment and temporary work' flow. Among the problems in material flow, the biggest impact was due to difficulties in finding materials. When subcontractors were used for the activities that are normally subcontracted, there was a significant reduction of the median delays from 67 to 37 days (equivalent to a 45% reduction). These findings are an important measure of how much supply chain delays may impact on project performance and suggest that problems related to the supply chain in construction are likely to generate significant disruption.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: architect; client; construction project; construction supply chain; duration; equipment; interview; materials; project performance; simulation; subcontractor; supplier; supply chain management
Index terms: interview, information flow, survey, construction project, management practice, subcontractor, main contractor, temporary work, investigation, project performance, construction supply chain, architect, construction industry, duration
Subjects: information systems, industry analysis, project controls, project management theory and practice, production management, management, operations management, practitioner, construction logistics, data collection methods, profession
Topics: Project Management, Supply Chain Management, Research Practice, Business Strategy, Roles and Professions, Digital Applications, Site Management, Time Control
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here