Development of a wireless real-time productivity measurement system for rapid construction operations

Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.

Abstract

Existing on-site construction productivity measurement methods have some common limitations, such as the inability to provide data to engineers and project managers for real-time analyses and the difficulties of sharing data among participants involved in construction operations. To address these shortfalls, a wireless real-t ime productivity m easurement (WRITE) system was developed. To validate the system, field experiments were conducted at highway and bridge construction sites. Statistical methods, such as the hypothesis test, the normality test, the paired t-test, and the Wilcoxon Signed Rank Test, were conducted to systematically analyze the experimental data. Results of the statistical analyses proved that the developed system generated identical productivity measurements compared to the stopwatch method, which is considered the classic productivity measurement method. In addition, a procedure to improve the on-site construction using the WRITE System and benchmarking technique was developed. The WRITE System has a potential to strengthen communication and coordination among participants involved in the infrastructure construction process by providing more accurate productivity information in real time.

Item Type: Thesis (Doctoral)
Thesis advisor: Bai, Y
Uncontrolled Keywords: coordination; measurement; measurement method; construction site; highway; benchmarking; bridge construction; communication; infrastructure construction; productivity; project manager; experiment
Index terms: construction operation, benchmarking, statistical method, measurement method, infrastructure construction, experiment, engineer, real time, coordination, construction site, statistical analysis, productivity, construction productivity, project manager, bridge construction
Subjects: data science, project controls, financial and cost management, infrastructure engineering, work location, performance measurement, construction operations, civil engineering, statistical analysis, operations management, management, profession, data collection methods
Topics: Site Management, Project Management, Cost Management, Engineering Principles, Organizational Design, Business Strategy, Roles and Professions, Time Control, Quality Management, Research Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here