Influence factors of engineering productivity and their impact on project performance

Liao, P-C (2008) Influence factors of engineering productivity and their impact on project performance. PhD thesis, University of Texas at Austin, USA.

Abstract

Effective management of engineering productivity is critical to achieving overall project success (CII 2001). Although engineering cost has approached to the level of 20 percent of a project's total cost on some industrial projects, engineering productivity is not well understood. For these reasons, the Construction Industry Institute (CII) developed an Engineering Productivity Measurement System (EPMS) that consists of quantity-based metrics to directly measure engineering productivity, and drive continuous performance improvement. However, barriers to system implementation exist. Productivity metrics in the EPMS are measured for various disciplines and thus evaluating overall productivity was initially difficult because of the lack of a summary metric. Because the EPMS is still new to the industry, limited understanding of its metrics has presented a challenge to gaining acceptance for its use in benchmarking. This has inhibited the realization of its potential for supporting improvement. Now that a dataset for the EPMS has been compiled, however, analyses can be performed to support research and the resulting findings will help to overcome implementation barriers of the EPMS. The author developed this research with data from the EPMS and input from industry. Feedback was collected in CII training sessions, committee meetings, and industry forums. The researcher undertook quantitative analyses using the EPMS data. The results will assist industry practitioners to effectively monitor and manage engineering process to reach project success. Four main objectives were achieved in this study: (1) discipline and project level indices to summarize engineering productivity were constructed; (2) influence factors as a foundation of engineering productivity improvement were identified; (3) discipline information dependencies were measured quantitatively; and (4) the associations between engineering productivity and project performance were documented.

Item Type: Thesis (Doctoral)
Thesis advisor: Thomas, S R and O'Brien, W
Uncontrolled Keywords: measurement; benchmarking; feedback; performance improvement; productivity; project success; training; project performance
Index terms: practitioner, benchmarking, quantitative analysis, dataset, project success, Construction Industry Institute, productivity, project performance, performance improvement, implementation
Subjects: research organizations, practitioner, data analysis and analytics, contractual arrangements, management, performance measurement, project management theory and practice, data management
Topics: Digital Applications, Research Practice, Business Strategy, Roles and Professions, Quality Management, Project Management, Procurement
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here