Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.
Abstract
Concurrent construction, in which multiple construction activities are carried out concurrently or overlapping, is a method developed to reduce time-to-market and increase the value of the project to the owner or user. When overlapping activities, the additional cost for overlap is affected by the interaction between overlapped activities which is affected by the construction work methods used. Thus concurrent planning of construction projects can lead to a benefit for the owner through investigating the interactions between work methods under overlap and finding the best degrees of overlap. However, the determination of the best solution from all the possible combinations of multiple methods and degrees of overlap is affected by the decision-making approach: by a centralized decision-maker (e.g., the project manager) with less accurate information about cost estimates or by a decentralized decision-maker(s) (e.g., subcontractors) with a myopic viewpoint. The objective of this dissertation is to compare the solutions from the two decision-making approaches and to identify the conditions in which one approach is preferred to the other. Thus project owners can benefit from choosing a better approach for concurrent planning under their own conditions. A Monte Carlo simulation model for each decision-making approach was developed: an algorithm for finding the best solution was developed by heuristic methods. Several parameters were incorporated into the models to reflect different conditions for the decision-making approaches: number of activities, number of methods, the project manager’s solution capacity, the uncertainty in the project manager’s knowledge and attitudes towards risk. The comparison of the two approaches was implemented with random cost under different conditions. Furthermore, the model was applied to a hypothetical construction project. From the simulations the major conclusions include: (1) The decentralized approach becomes preferred with more activities; (2) Considering more methods provides more potential for higher benefit to the owner in the decentralized approach; (3) The decentralized approach is recommended under risk-averse attitude and high uncertainty in the project manager’s knowledge.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Reinschmidt, K F |
| Uncontrolled Keywords: | market; uncertainty; construction project; concurrent construction; owner; project manager; subcontractor; heuristic; Monte Carlo simulation; simulation |
| Index terms: | owner, construction activity, Monte Carlo simulation, heuristic, project manager, concurrent construction, modelling, interaction, cost estimate, dissertation, construction work, subcontractor, decision-making, construction project |
| Subjects: | operations management, modelling and simulation, construction operations, analytical methods, financial and cost management, research dissemination and communication, profession, risk assessment, practitioner, sociology, decision analysis, behavioral psychology, production management |
| Topics: | Site Management, Roles and Professions, Stakeholder Management, Cost Management, Research Practice, Risk Management, Engineering Principles, Project Management |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here