Design decisions for hybrid projects using integrated building information

Adeyeye, O (2009) Design decisions for hybrid projects using integrated building information. PhD thesis, Loughborough University, UK.

Abstract

'Hybrid projects' is a phrase, used for the benefit of this research, to define a type of adaptation project where new elements or buildings are combined with existing buildings to completely modify it in order to provide better functionality and meet increased spatial requirements. It is the adaptation of an existing building through a combination of refurbishment, rehabilitation and adaptive reuse. The main challenge that designers face with hybrid projects is the quality of relevant yet qualitative 'as-built' information. In instances where original architectural and engineering drawings and details are available, it is highly probable that the building will have evolved to the extent that the historical drawings are no longer accurate. The design proposals produced with this information may then lead to problems during construction. This research investigated the impact of inadequate feasibility studies and surveys conducted on hybrid projects.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: feasibility studies; refurbishment; rehabilitation; reuse; designer
Index terms: designer, adaptation, adaptive reuse, feasibility study, proposal, survey, face, functionality, drawing, design decision
Subjects: sustainable design, design practice, data collection methods, profession, user focus, project planning, psychology, design stages, technical documentation, design features
Topics: Sustainability, Project Management, Organizational Design, Design Practice, Roles and Professions, Research Practice
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here