Linear scheduling of pipeline construction projects with varying production rates

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Abstract

Scope and Method of Study. The purpose of this research was to expand the capabilities of linear scheduling to account for varying production rates in pipeline construction when and where they occur. This new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR) had two objectives. The first of these objectives was to outline a framework to apply changes in production rates when and where they occur along the horizontal alignment of the project. The second objective was to illustrate the difficulty or ease of construction through the time-location chart. Findings and Conclusions. This research showed that the changes in production rates due to time and location can be modeled for use in predicting future construction projects. The model created for this purpose is the Linear Scheduling Model with Varying Production Rates. Using LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. The graphical format allows the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

Item Type: Thesis (Doctoral)
Thesis advisor: Oberlender, G D
Uncontrolled Keywords: duration; construction project; pipeline; scheduling; construction team
Index terms: variance, pipeline, construction team, shade, duration, scheduler, scheduling, pipeline construction, variation, construction project, linear scheduling
Subjects: practitioner, project delivery, operations research, production management, contractual condition, civil engineering, design elements, infrastructure and transport systems, measurement and scaling, project controls
Topics: Project Management, Engineering Principles, Design Practice, Time Control, Contract Administration, Research Practice, Roles and Professions
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here