Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.

Abstract

Each year in the United States hundreds of people die in automobile crashes in highway work zones and tens of thousands of motorists suffer injury or property damage due to crashes in highway work zones. The traveling public, designers, department of transportation agencies, and contractors will all benefit from research aimed at the reduction of crashes in highway work zones. Although much past research has delved into the various causes of work zone crashes and the various strategies to mitigate work zone crashes, little effort has been given to the overall management of the risks associated with work zone crashes. The goal of this research is to develop a new, integrated approach to the management of these risks. This goal is achieved through the development of a formal integrated risk management model to be utilized during the construction management and administration of highway projects for all stages of the project lifecycle. Within this integrated risk management program, validation and application of the model is accomplished by focusing on the three components of the standard risk management model: risk identification, risk analysis, and risk response. This project requires a multi-faceted research approach employing several methodologies. With the exception of the risk assessment portion of this research, the methodology for this project is primarily qualitative, using focus groups, surveys, personal interviews, and content analysis to identify work zone risks, mitigating strategies and the proper stakeholders and project phases in which to implement mitigating strategies. The model validation phase of this research involves qualitative assessments along with an analytic assessment of work zone hazards through database queries into a statewide crash database to produce a risk matrix tool. The risk matrix tool is a two dimensional representation of the frequency and severity of crashes with specific characteristics (hazards) that are associated with the crash and can be used by a risk management team to prioritize their responses to work zone risk.

Item Type: Thesis (Doctoral)
Thesis advisor: Strong, K C and Shane, J S
Uncontrolled Keywords: hazards; highway; injury; lifecycle; risk analysis; risk assessment; risk identification; risk management; designer; stakeholders; United States; content analysis; risk analysis; focus group; interview
Index terms: risk analysis, construction project, program, methodology, validation, strategy, content analysis, risk response, risk identification, survey, integrated approach, interview, United States, focus group, injury, fatalities, risk assessment, highway construction, risk management, lifecycle, transportation agency, project lifecycle, database, designer
Subjects: transportation engineering, environmental hazards, data management, health conditions and diseases, Geography, production management, financial risk, professional development, management, health risk and incident analysis, civil engineering, software systems, research methods, contractual arrangements, data analysis and analytics, project delivery, risk assessment, profession, data collection methods, project completion
Topics: Health and Safety, Geographical Context, Project Management, Engineering Principles, Risk Management, Procurement, Sustainability, Cost Management, Business Strategy, Research Practice, Information Management, Roles and Professions, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here