Estimating the labour demand for housing construction

Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Abstract

Housing in the UK accounts for one-third of all new build construction making it the single largest sector in the industry. Houses and flats make up 95% of all residential construction. The question this research aims to address is whether it is possible, given the value, duration and type of a project, to determine the amount of labour for each trade required. To address this, labour co-efficients for nine trades were calculated as the amount of man-years expended per million pounds worth of work. Bills of quantities were analysed for two projects to calculate the co-efficients. One project was traditional construction; the other was timber-framed. In total 80 bills were used representing different types of houses (eg detached, terraced etc). By applying the labour required for each item in the bill, derived from standard estimating price books, it was possible to calculate the labour required in each trade. The total for each trade could then be summed, along with the associated price, to determine the total labour requirement per unit value. The results demonstrated that the variability in the labour co-efficients between houses of the same type is greater than between houses of different types. Using the insight obtained from this finding two sets of labour co-efficients have been produced by this research. One of these addresses traditional construction, the second timber framed buildings. These co-efficients can be used to provide a high-level estimate of the total labour in each trade required for a housing construction project given its value.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: bills of quantities; housing; labour co-efficients; productivity
Index terms: traditional construction, new build, estimate, estimating, housing, duration, variability, bills of quantities, productivity, labour requirement, residential construction
Subjects: statistical analysis, financial and cost management, management, project controls, heritage and conservation, construction type, construction integration
Topics: Cost Management, Site Management, Business Strategy, Time Control, Construction Technology, Research Practice, Design Practice
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here