Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese)

Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.

Abstract

This thesis is a part of the research results of the "state development and reform commission high-tech project". It is an organic combination of hydraulic engineering construction management decision method and computer decision support system. It mainly studies the hydraulic-engineering material allocation model and the decision support system based on network analysis methods, and applies them to the reality. The systematic design method is universal to many kinds of hydraulic engineering projects. The main work and the innovation are as follows: Firstly, this thesis constructs a material flow balance model and a decision support system for hydraulic engineering. The question of hydraulic engineering material flow equilibrium is studied. Then, a suitable model based on minimizes the total transportation distance of unit material is proposed. A hydraulic engineering material flow equilibrium decision support system is constructed which is including an inference engine of supply and demand, a traffic network inference engine, a material flow equilibrium module and a visualization simulation module. And its software architecture is discussed. The related research results already published in and , and so on. The constructed system has good versatility for hydraulic engineering projects of China. The thesis's innovations are as follows: a) The thesis provides a new road-searching method based on the properties of Boolean matrix to assist the analysis of traffic network condition of construction site. Considering that the condition of actual dam traffic network is complicated, it supposes the whole traffic network is directed loop transport network, including multiple loading material points, intersections, unloading material points, road section and route, and thus it is able to analyze the topology interrelation of various material yards, excavation projects, transferring yards, unloading material point, intersection, road section and route. And a searching-routes method is given. b) The thesis provides an upgraded MOLP model to assist the engineers to implement high embankment dam material flow equilibrium in a scientific manner. It is different from traditional optimization models based on supply and demand restraint. The material flow equilibrium results may concrete to each material yard, each excavation project, each medium yard, each emptying-point, each crossing, each section and each route. The optimization results of the transportation problem of earthwork allocation with multi-starting and multi-emptying points matches to the actual capacity of road sections and intersections. Secondly, this thesis present a supply chain network cost pricing model on the base of the author's former researches of production, transportation, sale supply chain network. Related research results will be published in . The model discusses a project with n construction nodes, through constructing the balance equation, income equation and cost equation of each construction node to obtain the pricing equations of the project. The data of the model is easy to collect. It is simple, flexible and economical. The calculation scale may be very big. Thirdly, the above models and system construction methods is applied to a Chinese national key Nuo Zha Du project. The outcome demonstrates that the material flow equilibrium model and decision support system, and the supply chain network cost pricing model are applicable to various types of Chinese hydraulic engineerings. They can provide material equilibrium and pricing scheme in accordance with basic data and requirements of the project supplied by the user, and can decrease the construction

Item Type: Thesis (Doctoral)
Thesis advisor: Xia, G P
Uncontrolled Keywords: decision support; optimization; simulation; construction site; embankment; traffic; construction method; excavation; innovation; pricing; visualization; China; network analysis
Index terms: earthwork, decision support, construction site, construction method, excavation, management decision, China, visualization, topology, embankment, network analysis, supply and demand, pricing, engineer, income, hydraulic, module, design method, loading
Subjects: market analysis, decision analysis, building construction, infrastructure and transport systems, design practice, architectural elements, geometry and topology, decision-making and reasoning, Geography, construction methods, work location, data analysis and analytics, construction operations, fluid mechanics, economic analysis, profession, design methods
Topics: Geographical Context, Engineering Principles, Risk Management, Research Practice, Business Strategy, Roles and Professions, Design Practice, Site Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here