The development of a performance measurement framework for FE/HE co-location construction projects

Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects. PhD thesis, Heriot-Watt University, UK.

Abstract

Project success is understood differently by project participants because it is multifaceted, requiring many performance measures to determine success. Previous studies have underrepresented the business context of projects and their role in contributing to the success of the instigating organisation. This issue becomes particularly significant when two or more further and higher education (FE/HE) organisations co-locate their educational operations on a shared site and seek diverse goals from a single project. The relationship between construction project success and long-term educational success created the need for a comprehensive performance measurement framework that defines the contribution of the construction project in supporting FE/HE collaborating institutions through providing a learning environment that enhances the shared educational activities. This study explores the success of constructing a co-located further and higher education (FE/HE) campus when a project definition that continues beyond construction project completion and commissioning, and which encompasses the client’s views of expected business benefits, is adopted. The research developed a measurement framework capable of measuring the performance of FE/HE co-location construction projects, in light of this broader definition. The methodology used to achieve the research aim, influenced by the pragmatic views of the researcher, combined several methods. A focus group identified success criteria for constructing FE/HE co-location campuses. A questionnaire survey elicited the relationships between success criteria from representatives of the directors, senior administrators, and estates managers of further and higher education providers throughout Scotland. Finally, a Delphi survey validated the performance measurement framework by capturing the views of experts in FE/HE co-location. The thesis contributes a comprehensive performance measurement framework structured around two distinctive performance perspectives (performance drivers and performance results) which incorporates multiple project success dimensions and measures. The framework provides a structured way of aggregating performance measures to characterise the representation of thematic performance dimensions.

Item Type: Thesis (Doctoral)
Thesis advisor: Thomson, D
Uncontrolled Keywords: client; construction project; focus group; higher education; learning; measurement; project success; questionnaire survey
Index terms: questionnaire, co-location, Delphi survey, performance measurement, project success, higher education, focus group, success criteria, manager, performance measure, Scotland, methodology, commissioning, construction project, survey, dimension
Subjects: educational institutions, operations management, health monitoring assessment and metrics, assessment methods, performance measurement, project management theory and practice, data collection methods, completion, research methods, Geography, practitioner, production management
Topics: Site Management, Health and Safety, Project Management, Quality Management, Research Practice, Roles and Professions, Education, Geographical Context
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here