Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Abstract
Efficient highway investment decision-making becomes increasingly important in transportation. In order to facilitate such a decision process, one of the key issues is to estimate benefits of highway projects and utilize those values for project selection to yield optimal investment decisions. The existing methodologies for highway project evaluation are limited to probabilistic risk assessments of input factors such as construction, rehabilitation, and maintenance costs; travel demand; and discount rates that are inherited with risks. This research introduces a new approach for highway project evaluation extended from Shackle's model to explicitly address cases where those input factors are under uncertainty with no definable probability distributions. Then, a generalized methodology for highway project evaluation with input factors under certainty, risk, and uncertainty is established. If an input factor is under certainty, its single value is directly used. If an input factor is under risk, the mathematical expectation of the factor based on the probabilistic risk assessment can be determined. If an input factor is under uncertainty, a single-valued outcome of the factor can be estimated according to a preset decision rule in the extension of Shackle's model. The values of input factors separately determined under certainty, risk, and uncertainty can be used to compute the overall benefits of a highway project in the physical asset's one service life-cycle and in perpetuity horizon, respectively. The developed methodology offers flexibility for the decision-maker to consider any combination of input factors under certainty, risk or uncertainty and it could be applied to estimate the amount of benefits associated with sub-project benefit items (if a specific benefit item is further separable) under certainty, risk or uncertainty in accordance with available information. For project selection, a stochastic optimization model is developed as the multi-choice multidimensional Knapsack problem with Q-stage budget recourses. The model facilitates the selection of a subset of candidate highway projects across a multiyear analysis period under budget uncertainty aimed to achieve maximized overall project benefits. Contract-, corridor-, and deferment-based tradeoff methods are employed to assess the impacts of spatial and temporal restrictions on project selection results. An efficient solution algorithm with the computational complexity of O(N2) is developed for the proposed stochastic model. A case study using data on state highway programming in Indiana for period 1996–2006 is conducted to apply the methodology for project evaluation with input factors under certainty, risk, and uncertainty and the stochastic model for project selection under budget uncertainty. Cross comparisons of project benefits estimated with and without uncertainty considerations are made. The new methodology for project evaluation and model for project selection can be adopted by state transportation agencies to improve the efficiency of highway investment decisions.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Li, Z |
| Uncontrolled Keywords: | complexity; flexibility; optimization; uncertainty; highway; decision making; investment; life cycle; programming; project evaluation; rehabilitation; service life; probability; case study; risk assessment |
| Index terms: | case study, service life, efficiency, investment decision-making, probability distribution, decision process, transportation agency, life cycle, risk assessment, highway construction, project selection, project evaluation, maintenance cost, investment decision, estimate, tradeoff, physical asset, discount rates, programming, methodology, decision-making, complexity |
| Subjects: | systems engineering, statistical analysis, transportation engineering, decision analysis, asset management, cognitive psychology, financial risk, financial management, performance management, civil engineering, research methods, economic analysis, financial and cost management, programming, value management, data collection methods |
| Topics: | Engineering Principles, Project Management, Risk Management, Quality Management, Research Practice, Cost Management, Business Strategy, Digital Applications |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here