Process-based cost modeling to support target value design

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Abstract

In the current practice of collecting construction cost data, the cost of an installed component is compiled by adding up the cost of materials plus the cost of all resources used to install that component. This total includes inefficiencies and wastes which are inherent in construction processes, especially in projects that do not rigorously use methods to eliminate process waste or that do not use continuous improvement. Traditional cost models such as Parametric, Assembly and System, and Unit Price and Schedule models rely on historical data to model the cost of new designs. These cost estimates are inflated by the wastes embedded in the historical databases, and result in increased estimated task durations and excessive estimated resource needs. In Target Value Design (TVD), product- and process design are integrated and the design team needs rapid cost feedback to trade off design alternatives. However, traditional cost models do not reflect cost changes due to changes in process design. Therefore, a cost model that takes into account the cost implications of logistics and construction processes can better support TVD in integrating product- and process design. This raises a need for an alternative cost modeling method, which must be able to specify: (1) cost changes due to changes in product design (i.e. , changes in materials, shapes, or dimensions), and (2) cost changes due to changes in process design (i.e. , changes in sequencing, logistics plans, or construction processes). This dissertation provides a framework for a Process-Based Cost Modeling (PBCM) method including three phases: (1) collecting process- and cost data, (2) mapping process- and cost data to objects of a Building Information Model (BIM), and (3) providing cost feedback to inform TVD. This dissertation develops a theoretical understanding of cost modeling in TVD and argues for the use of a PBCM to support TVD during the Design Development phase. It presents processes and tools that could aid in its implementation. It also examines the role of BIM in implementing the PBCM framework and explains the role of process modeling in a virtual construction environment in supporting PBCM. This dissertation delivers a proof of concept of a PBCM framework and validates it through case studies and professionals' evaluations. The first case study analyzes conventional practices of designing, procuring, estimating, and installing a window system in a residential project in San Francisco, CA. The second case study investigates the application of the model-based process simulation, the PBCM, and the Choosing By Advantages (CBA) Decisionmaking System to evaluate alternatives of Viscous Damping Wall (VDW) installation in the Cathedral Hill Hospital (CHH) project in San Francisco, CA. The third case study examines the application of a software tool to integrate product- and process cost of the VDW system with a BIM model. Research findings illustrate the effectiveness of PBCM in providing rapid cost feedback to designers that facilitates the process of design to targets. In addition, PBCM helps to make both process-related cost and product cost explicit to designers when they are analyzing design alternatives. Further research can refine steps of PBCM applied in Design Development and explore the application of PBCM in design phases other than Design Development such as Conceptual Design or Construction Document phases. Further research is also needed to advance tools to facilitate the implementation of PBCM in the Lean Project Delivery System™.

Item Type: Thesis (Doctoral)
Thesis advisor: Tommelein, I D
Uncontrolled Keywords: continuous improvement; duration; effectiveness; residential; construction cost; hospital; building information model; estimating; feedback; logistics; project delivery; designer; professional; process simulation; case studies; case study; simulation
Index terms: process design, design team, product design, process modelling, process simulation, estimating, process waste, conceptual design, cost model, window, mapping, residential project, construction process, database, designer, construction cost, continuous improvement, case study, target value design, project delivery, dissertation, design development, dimension, lean project delivery, implementation, modelling, duration, cost estimate, cost data, effectiveness, design phase
Subjects: design analysis, contractual arrangements, professional practice, innovation and technology management, health monitoring assessment and metrics, analytical methods, financial and cost management, project delivery, profession, research dissemination and communication, data collection methods, waste management, design methods, value management, project controls, data management, building construction, performance measurement, design practice, architectural elements, management, economic development, performance management, accounting and finance, lean construction, spatial and geospatial analysis, design process
Topics: Quality Management, Health and Safety, Project Management, Engineering Principles, Procurement, Sustainability, Design Practice, Urban Studies, Digital Applications, Site Management, Time Control, Business Strategy, Cost Management, Research Practice, Roles and Professions
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here