Risk analysis for tunneling projects

Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.

Abstract

Tunnel construction is increasing world wide. Although the majority of tunnel construction projects have been completed safely, there have been several incidents that have resulted in delays, cost overruns, and sometimes more significant consequences such as injury and loss of life. To help eliminate these accidents, it is necessary to systematically assess and manage the risks associated with tunnel construction. In order to better understand the conditions under which accidents occur, a database of 204 tunnel construction accidents was assembled. This is the most comprehensive database known to date. The database was analyzed to better understand the causes of accidents. Influence diagrams were constructed containing the main factors, and the interactions between them. These served as the basis of the risk assessment methodology presented in this work. The risk assessment methodology consists of combining a geologic prediction model that allows one to predict geology ahead of the tunnel construction, with a decision support model that allows one to choose amongst different construction strategies the one that leads to minimum risk. The geologic prediction model is based on Bayesian networks because of their ability to combine domain knowledge with data, encode dependencies among variables, and their ability to learn causal relationships. The combined geologic prediction-decision support model was then applied to the Porto Metro, in Portugal. The results of the geologic prediction model were in good agreement with the observed geology, and the results of the decision support model were in good agreement with the construction methods used. More significant, however, is the ability of the model to predict changes in geology and consequently changes in construction strategy. This was shown in two zones of the tunnel were accidents occurred, where the model predicted an abrupt change in geology, and the construction method should have been changed but was not. Using the model could have possibly avoiding the accidents. This risk assessment methodology provides a powerful tool with which planners and engineers can systematically assess and mitigate the inherent risks associated with tunnel construction.

Item Type: Thesis (Doctoral)
Thesis advisor: Einstein, H H and Veneziano, D
Uncontrolled Keywords: decision support; geology; injury; tunnel; risk assessment; Portugal; risk analysis; cost overrun; construction project; construction method
Index terms: decision support, injury, tunnel, strategy, construction method, prediction model, methodology, construction project, risk analysis, tunnel construction, engineer, cost overrun, Portugal, bayesian network, database, risk assessment, planner, interaction
Subjects: research methods, civil engineering, management, financial risk, production management, Geography, health conditions and diseases, probabilistic model, building construction, decision analysis, data management, behavioral psychology, environmental hazards, infrastructure and transport systems, profession, financial and cost management, prediction and forecasting
Topics: Project Management, Geographical Context, Engineering Principles, Health and Safety, Sustainability, Risk Management, Research Practice, Business Strategy, Cost Management, Roles and Professions, Digital Applications, Site Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here