Modeling cost and time uncertainty in rail line construction

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Abstract

Transportation construction projects are often plagued by cost overruns and delays. Technical, economic-political, psychological, and legal causes explain the frequent underestimations. To counteract such underestimations, the author developed an innovative approach to capture cost and time uncertainty in rail line projects, and applied this to the construction of a new high speed rail line in Portugal. The construction of the four main types of structures in rail lines (tunnels, viaducts, cuts and embankments) is modeled bottom-up from the single activity to the entire rail line. Sub-networks of activities are combined in structure networks to model the rail line structures; in turn, the structure networks are organized in the construction network to represent the rail line. For the first time, three sources of uncertainty (variability in the construction process, correlations between the costs of repeated activities, and disruptive events) are modeled jointly at the level of the single activity. These uncertainties are propagated to the total construction cost and time through the combination of the individual activity costs and times. The Construction and Uncertainty Models are integrated in the Decision Aids for Tunneling (DAT), which have been extended beyond tunneling to consider different structures and different uncertainty types. Based on historical input data and expert estimations, the cost and time uncertainty in the construction of four alignments of the new Portuguese high speed rail line is simulated. The three sources of uncertainty cause different cost and time impacts depending on the type of structure suggesting structure specific mitigation measures. Most importantly, their cumulative impact causes significant increases in construction cost and time compared to the deterministic estimates: 58% in the construction cost of tunnels, and 94% in the construction time of cuts and embankments. The Construction and Uncertainty Models and their integrated implementation in the DAT provide transportation agencies with a modeling tool to tackle cost and time uncertainty in the construction of rail lines and other linear/networked infrastructure projects.

Item Type: Thesis (Doctoral)
Thesis advisor: Einstein, H H
Uncontrolled Keywords: uncertainty; construction cost; Portugal; cost overrun; construction project; embankment; tunnel; infrastructure project
Index terms: infrastructure project, estimate, implementation, modelling, construction time, variability, high speed rail, construction cost, cost overrun, transportation agency, estimation, Portugal, construction project, construction process, mitigation, embankment, tunnel
Subjects: project controls, infrastructure and transport systems, statistical analysis, financial and cost management, building construction, transportation engineering, Geography, production management, financial risk, contractual arrangements, analytical methods
Topics: Engineering Principles, Geographical Context, Project Management, Procurement, Time Control, Site Management, Research Practice, Cost Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here