Robust statistical methods for non-normal quality assurance data analysis in transportation projects

Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.

Abstract

The American Association of Highway and Transportation Officials (AASHTO) and Federal Highway Administration (FHWA) require the use of the statistically based quality assurance (QA) specifications for construction materials. As a result, many of the state highway agencies (SHAs) have implemented the use of a QA specification for highway construction. For these statistically based QA specifications, quality characteristics of most construction materials are assumed normally distributed, however, the normality assumption can be violated in several forms. Distribution of data can be skewed, kurtosis induced, or bimodal. If the process shows evidence of a significant departure from normality, then the quality measures calculated may be erroneous. In this research study, an extended QA data analysis model is proposed which will significantly improve the Type I error and power of the F-test and t-test, and remove bias estimates of Percent within Limit (PWL) based pay factor calculation. For the F-test, three alternative tests are proposed when sampling distribution is non-normal. These are: (1) Levene’s test; (2) Brown and Forsythe’s test; and (3) O’Brien’s test. One alternative method is proposed for the t-test, which is the non-parametric Wilcoxon - Mann – Whitney Sign Rank test. For PWL based pay factor calculation when lot data suffer nonnormality, three schemes were investigated, which are: (1) simple transformation methods, (2) The Clements method, and (3) Modified Box-Cox transformation using “Golden Section Search” method. The Monte Carlo simulation study revealed that both Levene’s test and Brown and Forsythe’s test are robust alternative tests of variances when underlying sample population distribution is non-normal. Between the t-test and Wilcoxon test, the t-test was found significantly robust even when sample population distribution was severely non-normal. Among the data transformation for PWL based pay factor, the modified Box-Cox transformation using the golden section search method was found to be the most effective in minimizing or removing pay bias. Field QA data was analyzed to validate the model and a Microsoft® Excel macro based software is developed, which can adjust any pay consequences due to non-normality. KEYWORDS: Quality Assurance, Non-normality, F-test and t-test, Percent within Limits, Robust statistical tests.

Item Type: Thesis (Doctoral)
Thesis advisor: Goodrum, P M
Uncontrolled Keywords: bias; population; highway; quality assurance; Monte Carlo simulation; simulation; specification
Index terms: transportation project, quality assurance, specification, data analysis, agency, statistical test, population, bias, evidence, Monte Carlo simulation, transformation, variance, estimate, construction material, highway construction, statistical method, sampling
Subjects: demography, quality assurance, evaluation and assessment methods, civil engineering, contractual condition, probability and distributions, sociology, measurement and scaling, infrastructure and transport systems, statistical analysis, data collection methods, business, building materials, modelling and simulation, data analysis and analytics, financial and cost management
Topics: Research Practice, Business Strategy, Cost Management, Contract Administration, Urban Studies, Engineering Principles, Quality Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here