Risk management for build, operate and transfer projects within Kuwait

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Abstract

Infrastructure projects, based on the Build-Operate-Transfer, (BOT), method, have been of interest to governments of developed and developing countries for some time, resulting in their worldwide use. Using the BOT method enables governments to reallocate risks and rewards to the private sector for larger infrastructure projects throughout the projects' operating life. In order to implement a BOT infrastructure project successfully, one of the essential requirements is to carry out a thorough analysis of risks relating to the project including the social, economic, environmental, political, legal, and the financial aspects. Due to the fact that the type of risk study required for large-scale projects is so sophisticated, and therefore expensive and time consuming, the government, due to lack of expertise and time, often obtains a project viability study from the private sector. This can cause problems in that the private sector may incur financial losses or even bankruptcy, unless the host government guarantees compensation to the losers of the bid. Because all parties have different targets which they wish to achieve from the project, a may conflict arise and cause lengthy negotiations, sometimes lasting for years which often result in the death of the project. The greatest opportunity for a successful outcome for a BOT project is obtained when the extensive efforts and costs involved in the risk study process are shared by all parties. The responsibility of the decision maker is to identify, understand and analyse the many risk factors both, qualitative, (linguistic in nature) and quantitative, that will affect funding, procurement, developing, construction and operation, before proceeding with the build stage of the project. Firstly, it is necessary to evaluate the quantitative risk factors subjectively, and list them in order of importance. Secondly, conduct an evaluation of the qualitative factors and since the consideration of qualitative factors is subjective, the decision-maker will often limit the number of factors being evaluated, possibly resulting in inconsistent results. This study proposes a decision framework, which would be useful in determining the influence of the qualitative risk factors on the project management of BOT infrastructure projects. A methodology is provided to enable the identification of interrelationships between the Risk Factors and their influence on the project. Using analytical hierarchy process (AHP) techniques, which model the relationships between the risk factors, a validation of this approach will be sought using a decomposed evaluation method and also information obtained from three existing case studies, (the Channel Tunnel, Sulaibiya Wastewater Treatment and Reclamation Plant and Marsa Allam Airport). The results of the decomposed approach were compared to experts' holistic evaluations for the same case studies mentioned above. The findings indicate that the decomposed approach showed a strong correlation to the holistic approach. An evaluation of the risks for the Sulaibiya Wastewater Treatment and Reclamation Plant study is provided and suggestions made to highlight risks attached to such a project before it is actually undertaken. Using the decomposed approach enables the decision-maker to see the contribution of each risk compared to all of the risks in the total project and will help to determine and subsequently minimize or preventing any risk factors and so considerably improving the risk management of the project.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: build-operate-transfer; developing countries; government; guarantees; infrastructure project; negotiation; private sector; project success
Index terms: methodology, Kuwait, reclamation, validation, developing country, guarantee, tunnel, bankruptcy, analytical hierarchy process, qualitative factor, infrastructure project, compensation, negotiation, project management, funding, build-operate-transfer, risk factor, holistic approach, risk management, decision framework, private sector, case study, project success
Subjects: conflict resolution, decision analysis, infrastructure and transport systems, industry analysis, contract structure, professional development, project management theory and practice, data analysis and analytics, data collection methods, risk assessment, business, dispute resolution, decision-making and optimization, environmental hazards, research methods, Geography, development economics, land management, contractual arrangements, economic analysis
Topics: Legal Issues, Geographical Context, Project Management, Engineering Principles, Risk Management, Procurement, Sustainability, International Construction, Business Strategy, Research Practice, Information Management, Stakeholder Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here