Construction risks allocation: Optimal risk allocation decision support model

Alsalman, A A (2012) Construction risks allocation: Optimal risk allocation decision support model. PhD thesis, Oregon State University, USA.

Abstract

It has been suggested that projects in the construction industry are subject to risks more than other industries. However, there is often little parity in allocation of risks in the construction industry. Usually, project participants allocate risks by aversion where owners tend to shift risks to the primary contractor, who in turn transfers them to the subcontractors. As a result of this, risks are not necessarily allocated/re-allocated to the party that is best able to manage them efficiently and effectively. Risk allocation can significantly influence the behavior of the project participants and hence affects project schedule, cost and performance. Inappropriate risk allocation has led to adversarial relationships between contracting participants and has consequently increased project cost. The objective of this dissertation is to shed light on the current practices of risk allocation in the construction industry. The dissertation consists of three sections. The first section investigates and evaluates the problems of the current practice of risks allocation and their impacts on project performance. The second section investigates, identifies, and classifies barriers to optimal risk allocation. The third section looks into allocating construction risk from a more cooperative and rational perspective. The goal is to provide the construction industry with a rational decision-making mechanism that will provide an alternative to the current practice of typically allocating risks by aversion. To meet the objectives, structured survey questionnaires for Sections One and Two were used. The first survey found that the current practice of risk allocation has four major problems. These problems include: 1. Dispute, claims and tension leads to adversarial relationships. 2. Competitive relationship leads to aggressive relationships. 3. Subjective pricing of risk leading to higher contingency. 4. Allocation by aversion that leads to misallocation of risks. The second survey found thirteen barriers to optimal risk allocation, which were classified into three main categories: behavioral, technical, and organizational barriers. Lack of an efficient risk allocation mechanism ranks at the top of the identified barriers. These findings were linked, in causal-effects relationships, to formulate an analytic model for the current practice of risk allocation. This dissertation uses the research findings and the rational decision-making process to develop a practical mechanism for optimizing risk allocation. The developed mechanism was then fine-tuned and validated by a Delphi expert panel technique. The developed mechanism should aid construction industry professionals and construction project participants in making rational and economical risk allocation decisions to alleviate the identified above-mentioned problems, overcome the identified barriers, and improve project efficiency by minimizing the negative impacts of the current practice of risk allocation on project cost, schedule and overall project performance.

Item Type: Thesis (Doctoral)
Thesis advisor: Sillars, D N
Uncontrolled Keywords: efficiency; construction project; contingency; pricing; project cost; owner; professional; subcontractor; project performance
Index terms: subcontractor, questionnaire, construction project, decision-making, survey, project cost, decision support, dissertation, construction industry, project performance, risk allocation, dispute, owner, decision-making process, pricing, efficiency
Subjects: financial risk, production management, practitioner, research dissemination and communication, economic analysis, project management theory and practice, performance management, economics, industry analysis, decision analysis, sociology, dispute resolution, data collection methods
Topics: Business Strategy, Cost Management, Research Practice, Stakeholder Management, Roles and Professions, Project Management, Risk Management, Legal Issues, Quality Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here