Multi-parameter bidding in highway construction and rehabilitation projects

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Abstract

According to the 2013 ASCE infrastructure report card, roads have been given a grade of D. In addition, the level of federal, state, and local capital investment is insufficient and projected to result in a farther decline in conditions and performance in the long term. Poor highway conditions have caused transportation agencies to shift their focus from expanding road networks to rehabilitation of their existing infrastructures. In response to increasing road user costs caused by rehabilitation or reconstruction projects and limited resources due to insufficient capital investments, State Highway Agencies (SHAs) have started to utilize innovative contracting methods by incorporating construction time and life-cycle cost into the bidding process. In multi-parameter bidding method, a combination of price, construction time, and life-cycle cost is considered the decisive factor in awarding a contract to the successful bidder. The purpose of these bidding methods is to obtain accelerated construction at the lowest possible cost in order to minimize inconvenience to the public. However, unlike conventional bidding, SHAs are required to determine the Unit Time Value (incentive/disincentive rate) and life-cycle cost parameters before the bid process. This study focuses on the impact of different Unit Time Values on the competitiveness of contractors in the A+B bidding process. A new criterion is introduced to assist SHAs to determine an optimal Unit Time Value to maximize the competition during the bid process. To assist SHAs in determining the value of the life-cycle cost factor, an association analysis method in data mining is applied to historical pavement treatment datasets in order to identify the sequential patterns of various maintenance and rehabilitation activities. Since the newly developed life-cycle cost analysis models are based on the actual treatment strategies, it is expected that the life-cycle cost factor determined by this model is more realistic and closer to actual costs than that of the traditional approach suggested by the Federal Highway Administration. The results of this research will facilitate collaboration among different parties in highway construction contracts. It will advance Integrated Project Delivery (IPD) methods which are a collaborative alliance between SHAs and contractors.

Item Type: Thesis (Doctoral)
Thesis advisor: Jeong, H S and Oberlender, G D
Uncontrolled Keywords: competition; competitiveness; contracting methods; construction project; highway; pavement; bidding; capital investment; collaboration; cost analysis; investment; project delivery; rehabilitation; data mining
Index terms: reconstruction, integrated project delivery, actual cost, cost analysis, transportation agency, bidder, strategy, agency, contracting method, competition, capital investment, cost factor, multi-parameter bidding, collaboration, construction project, competitiveness, bidding, construction time, data mining, highway construction, project delivery, rehabilitation project, dataset
Subjects: data management, civil engineering, health conditions and diseases, building construction, transportation engineering, economic analysis, production management, project delivery, management, contractual arrangements, economics, data science, market analysis, bidding, sociology, financial and cost management, project controls
Topics: Cost Management, Procurement, Organizational Design, Project Management, Engineering Principles, Digital Applications, Research Practice, Health and Safety, Time Control, Business Strategy
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here