Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Abstract
A recent report on the teaching of construction history in Britain identified that there were few formal lectures at either undergraduate or postgraduate level. The vast re-armament and war production programmes of 1936 and onwards to 1945 required building and civil engineering construction on a scale, and at a speed, not previously undertaken. The aim of this research is to identify the government controls and the types of projects undertaken during this period and to investigate the role of the quantity surveyor and the relevant payment procedures. The research is reinforced with a detailed case study of the Mulberry Harbour one of the greatest construction and organisational achievements of the 20th century. The research is confined to published literature, initially difficult to locate, and much of which at the time was subject to the Official Secrets Act. The investigation has identified that all construction projects during WWII were subject to stringent controls by the British Government. A vast range of major construction works including ports, factories, airfields, barracks and military defences were executed during a period of severe shortages of skilled labour, materials and construction equipment. Payment methods to the contractors were initially based on target cost contracts and subsequently replaced by lump sum prices based on known norms incorporated into the Standard Schedules of Prices. Despite comprehensive control systems, national shortages of labour materials and plant the U.K. construction industry rose to the challenge during WWII and completed some remarkable projects not least the Mulberry Harbour.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | construction history; mulberry harbour; payment system; world war ii |
| Index terms: | construction industry, shortages, norms, undergraduate, postgraduate, war, construction project, control system, construction work, investigation, target cost, programme, harbour, skilled labour, quantity surveying, construction equipment, case study, construction history |
| Subjects: | architectural and construction history, economic analysis, curriculum development, operations management, data collection methods, profession, industry analysis, higher education, infrastructure and transport systems, sociology, project controls, construction equipment, production management, monitoring and control, conflict and crisis studies, economics, management |
| Topics: | Time Control, Education, Design Practice, Legal Issues, Human Resources, Roles and Professions, Plant and Equipment, Business Strategy, Cost Management, Project Management, Research Practice, Engineering Principles |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here