Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.
Abstract
With a desire to increase the chance of success of major infrastructure and construction (MIC) projects, it is increasingly common to invite the public participating in the planning and design processes. Public participation requires the involvement of individuals and groups who are positively or negatively affected by a proposed intervention (e.g. a project, a program, a plan, a policy). An effective public participation program can be beneficial to the parties involved (i.e. the decision makers and general public) in many ways. As a result, a number of participatory approaches have been developed by various sectors to drive the process of agenda-setting, decision-making, and policy-forming. Many research studies focusing on various aspects of participation in policy-making in general have been conducted, but few have looked into its application in the construction and infrastructure industry in particular. On the other hand, the decision making process of contemporary MIC projects is becoming ever more complicated especially with the increasing number of stakeholders involved and their growing tendency to defend their own interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate the decision making and evaluation. This research, therefore, aims to develop a multi-stakeholder multi-objective decision making and evaluation model to help resulting in consensus and increasing the satisfaction among various stakeholders (or stakeholder groups) in MIC projects. In this research, an extensive literature review was first carried out to examine the salient elements of public participation in MIC projects and to identify the barriers to effective public participation in project decision making in different countries (e.g. Australia, Canada, United Kingdom, United States, South Africa, etc.). China being a developing country was selected for in-depth case study analysis. Through a series of interviews, the underlying reasons for ineffective participatory practice in China were revealed. A questionnaire survey was then conducted to unveil those stakeholder concerns pertinent to MIC projects at the conceptual stages through the degree of consensus and/or conflict involved. Finally, a multi-stakeholder multi-objective decision model and a multi-factor hierarchical comprehensive evaluation model were developed. These two models were founded on the decision rule approach and the fuzzy techniques respectively. Another round of interview was conducted to investigate the (i) influence of different stakeholder groups in making decisions related to MIC projects during their conceptual stages; and (ii) relationship between the satisfaction of a single stakeholder group and that of the stakeholders overall. The application of the two models was demonstrated by two cases in Hong Kong and their validity was confirmed through validation interviews. The results indicated that the two models are objective, reliable and practical enough to cope with real world problems. The research findings are therefore valuable to the government and construction industry at large for successful implementation of public participation in MIC schemes locally and internationally in future, especially when the construction industry is becoming increasingly globalized and the trend of cultural integration between the East and West is ever growing.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | decision making; developing country; integration; policy; public participation; Australia; Canada; China; Hong Kong; South Africa; United Kingdom; United States; case study; questionnaire survey; failure; stakeholder; interview |
| Index terms: | construction industry, modelling, implementation, Canada, validity, Australia, decision-making process, becoming, project failure, satisfaction, case study, Hong Kong, South Africa, public participation, China, validation, questionnaire, program, decision-making, integration, survey, literature review, United Kingdom, participatory approach, design process, interview, developing country, United States |
| Subjects: | development economics, Geography, philosophical process, project completion, evaluation and assessment methods, analytical methods, contractual arrangements, professional development, software systems, industry analysis, decision analysis, organizational analysis, design methods, data collection methods, project delivery, participation process, data analysis and analytics |
| Topics: | Geographical Context, Project Management, Engineering Principles, Risk Management, Procurement, Design Practice, Digital Applications, International Construction, Organizational Design, Research Practice, Information Management, Stakeholder Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here