Automated schedule generation and analysis from a construction requirement perspective

Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.

Abstract

This dissertation presents an overarching framework to integrate, interpret, and analyze construction requirements for schedule auto-generation and change management. It includes a generalized automated scheduling framework which provides core modeling tools and primary scheduling procedures necessary for formalizing construction methods and requirements and automatically generating alternative schedules from them. Then a generalized model is developed to formalize and convert complex functional requirements into temporal constraints. To improve the efficiency and feasibility of scheduling from complex requirement, the overarching framework utilizes a pre-emptive constraint analysis framework which allows basic constraints redundancies/inconsistencies to be identified and removed before performing scheduling. Finally, the overarching framework proposes a new perspective for schedule analysis which is based on the criticality of constraints and construction requirements. Three industrial case projects are used to demonstrate key features of the overarching framework and verify the research findings.

Item Type: Thesis (Doctoral)
Thesis advisor: Chua Kim Huat, D
Uncontrolled Keywords: change management; scheduling; construction method
Index terms: modelling, dissertation, efficiency, scheduling, change management, redundancy, construction method
Subjects: management, performance management, building construction, operations research, analytical methods, research dissemination and communication
Topics: Research Practice, Human Resources, Time Control, Organizational Design, Site Management, Engineering Principles, Quality Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here