Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms

Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms. PhD thesis, University of Wisconsin - Madison, USA.

Abstract

Multinational firms working on construction projects often encounter significant risks beyond those encountered by local firms. Although risk mitigation measures are used when venturing into international markets, there has been little research into evaluating the impact of risks on project and firm performance in the Arabian Gulf Region (AGR). Risks are identified through an extensive data collection process from multinational companies with significant work experience in the AGR. The impact of these risks on four performance metrics is descriptively evaluated using Relative Importance Index (RII), Significance Score (SS), Risk Mapping Matrix (RMM) and Principal Component Analysis (PCA) for validation. The results indicate that firms are potentially exposed to a total of 27 external risks divided into political, economic, legal, natural, and social categories, and 47 internal risks divided into design, construction, financial, management, and maintenance categories. Of the 27 external risks, war threat, political instability, price inflation, resource availability and quality, authorities and regulation requirements, and inclement climate have the most significant impacts on the four performance metrics considered. Of the 47 internal risks, defective late design documents, constructive changes, and insufficient scope definition in the management risk category have the most significant impacts on the four performance metrics. Multivariate data analyses revealed that six out of the 27 external risks, including nationalism and local protectionism, permits and licenses, inclement climate, resource availability and quality, import and export restrictions and war threat had substantial influence over projects’ overruns. Of the 47 internal risks, defective/late design documents, long lead material/equipment, insufficient scope definition, equipment and labor productivity, inadequate schedule, and constructive changes, inaccurate supplemental design information, error in bids/quotation, and differing and unforeseen site conditions and coordination between subcontractors were found to have an influence over projects’ failure with regard to schedule or cost. Based on that, multinational firms seeking to work in AGR or similar countries that are rich in natural resources but experience significant political instability can use these findings as a guide to establish effective risk mitigation plans that reduce adverse effects on project and company performance.

Item Type: Thesis (Doctoral)
Thesis advisor: Russell, J S
Uncontrolled Keywords: coordination; failure; market; construction project; equipment; natural resources; export; inflation; markets; productivity; regulation; subcontractor
Index terms: relative importance index, overrun, performance metric, data analysis, risk mitigation, subcontractor, construction project, mapping, inflation, validation, regulation, documents, firm performance, productivity, import, natural resource, project success, management risk, markets, construction industry, coordination, principal component analysis, war, export, international market, labour productivity
Subjects: practitioner, economic analysis, environmental resource management, financial risk, development economics, production management, conflict and crisis studies, spatial and geospatial analysis, business analysis, risk assessment, data analysis and analytics, project management theory and practice, professional development, performance measurement, management, political science, statistical analysis, industry analysis, project controls
Topics: Project Management, Sustainability, Risk Management, Quality Management, Legal Issues, Information Management, Research Practice, Business Strategy, Cost Management, Governance, Roles and Professions, International Construction, Site Management, Organizational Design, Time Control
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here