Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain

Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Abstract

Many construction projects suffer from mismanagement despite continuous improvement in the field of project risk management. With the construction boom in the Middle East, and especially the Gulf region, construction projects suffer from a high failure rate. The lack of the implementation of standard risk management methods in the construction industry of the Gulf region leads to construction projects that suffer from poor performance, delays, disputes and claims. In order to design a standard risk management model, there is a need for an in-depth study of the construction environment to lay down the foundation for designing a Standard Construction Risk Management Model in the future. This study aims to identify and assess risk factors during the construction phase of construction projects in the Gulf region focusing on two countries of the Gulf region – the State of Kuwait and Kingdom of Bahrain. The risk factors (RF) were identified and assessed and responsiblty shares were allocated to construction parties: clients, consultants and contractors. The research strategy was a Sequential mixed-method. It was adopted by means of interview surveys followed by a questionnaire. The study started with a qualitative approach in which eleven practitioners were interviewed to evaluate and validate a questionnaire. This was followed by questionnaires distributed to a representative sample of 140 consultants, 128 contractors and 139 clients in the State of Kuwait, in addition to 71 consultants, 99 contractors and 78 clients in the Kingdom of Bahrain, to assess the negative impact of the risk factors during the construction phase on the completion of construction projects. Parametric tests were used to analyse the collected data. Including, the Analysis of Variance (ANOVA) test, the independent-samples t-test, and Pearson correlation coefficient (r) test. The study revealed a difference in perception of the risk factors negative impact on project completion between Kuwait and Bahrain, Bahrain perceives highest degree of impact on projects. On the categories level, both countries agreed on the Finance category as the main factor threatening project completion, and the External category as having the least impact. In Kuwait, almost all parties agreed on the negative impact of all categories on project completion except contractors who have different perception on management category. Furthermore, clients and consultants held different perceptions on the impact of design category. Bahrain results reveal significant differences in perceptions on the impact of categories between clients and the other parties, however there are slight differences between consultants and contractors in all categories. The limitations of the study include only large contractors and consultants in Kuwait and Bahrain were included in the study. The study was limited to the construction phase of construction projects and only six categories of risk factors were included in the study and This research was based on practitioners and participants opinions rather than actual occurrences on projects.

Item Type: Thesis (Doctoral)
Thesis advisor: Fenn, P
Uncontrolled Keywords: Bahrain; client; construction phase; construction project; consultant; dispute; interview; Kuwait; project risk management; risk management
Index terms: survey, strategy, interview, Middle East, questionnaire, practitioner, construction project, Kuwait, project risk management, dispute, continuous improvement, qualitative approach, variance, construction phase, construction industry, implementation, risk management, risk factor, Bahrain
Subjects: contractual arrangements, practitioner, environmental hazards, financial risk, production management, Geography, research methods, physical geography and landforms, project delivery, dispute resolution, data collection methods, risk assessment, industry analysis, measurement and scaling, management, performance measurement
Topics: Roles and Professions, Research Practice, Cost Management, Business Strategy, Quality Management, Legal Issues, Procurement, Sustainability, Risk Management, Project Management, Geographical Context
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here