Performance assessment of agile communication in construction

Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.

Abstract

Research has shown that the lack of effective communication is one main reason why the construction industry worldwide is falling behind others in advancing productivity, safety and quality. The focus of this thesis is to experimentally test the effectiveness of innovative information technologies in bridging existing information chasms creating large barriers to advancing construction. First, an extensive field study of the state-of-practice on an Australian construction site was conducted to identify the present information and material flows, information sinks, and sources related to rebar and concrete operations. The result of this initial field work was used to develop the Holonic Construction Management Model (HCMM) augmenting existing information models with the goal to create a unified umbrella able to support clearly identified data needs. The second phase of the work focused on testing four hypotheses. Building on the HCMM and the challenges of an active construction site, an Agile Site Communication Network (ASCNet) was created establishing the data conduits needed to connect the identified islands-of-communication. Furthermore, the discovered need to link mobile process resources with each other as well as to the internet involved the development and testing of a novel Embedded Wireless Communication Platform (EWCP). Another essential component of the ASCNet were multi-purpose and mobile data/information hubs to be placed at the work-front. This triggered the design, fabrication and testing of an electronic Construction Kiosk (eCKiosk) equipped with a wide touch screen, digital video/audio, wireless data-acquisition from electronic sensors and a secure data link to the world-wide-web. A third capability involved RFID tags to be embedded into the concrete of a ready-mix truck identifying its spatial location after placement.Finally, the experimental IT capabilities were used to address the four hypotheses established in Chapter 3. The extensive survey of electromagnetic signal attenuation on the test site proved that the existing decay functions were too inaccurate to be applicable for a construction site. Reformulated power decay indices drastically increased the signal strength prediction by more than a factor of 10 thus validating hypothesis 1. RFID embedded rebar bundles shipped on a GPS equipped trailer tuck and staged using feed-forward process information increased the productivity of crane-lifting by over 20% and eliminated 5 hours waiting of the delivery trucks that had been observed. The EWPC attached to a crane hook proved the feasibility and effectiveness of the multi-channel real-time communication link between the moving hook-block, the operator, GPS tracking software and the internet. The test of ZigBee�s IEEE 802.15 protocol under field condition provided the background for a successful application to monitor remotely concrete temperature for several days. The electronic hub served as a critical link to the wireless sensors while the RFID tags could be found after 4 days in the curing concrete and their locations automatically traced using a DGPS. Testes at the laboratory showed that doubling the amount of reinforcing steel in a concrete block scarifies 61% of detection range of the embedded tags.The tests on two construction sites not only improved our understanding of how to model wireless networks but proved that: a) A fatal blind-spot for crane operators can be immediately eliminated, b) time and safety risks during the delivery and staging of rebar can be drastically reduced, c) embedded RFID tags in combination with DGPS automate as-built data generation for concrete, and most importantly d) the high performance agile communication technologies of an eCKiosk and ZigBee sensor networks enable the effective coordination of on- and off-site activities. The latter two findings will open the door to cutting large process wastes through feed-forward supply-chain integration.

Item Type: Thesis (Doctoral)
Thesis advisor: Bernold, L
Uncontrolled Keywords: automation; agile information flow; construction site; wireless communication; wireless sensor network; real-time measurment; Australia
Index terms: real-time measurment, platform, productivity, Australia, acquisition, rebar, effectiveness, testing, construction industry, internet, automation, coordination, performance assessment, crane operator, fabrication, laboratory, placement, wireless sensor network, field study, communication network, signal strength, construction site, agile information flow, survey, reinforcing steel, integration, curing, lifting, signal attenuation, concrete block, wireless communication, process waste, information technology
Subjects: professional practice, digital technology, waste management, practitioner, information flow, networking, assessment methods, research management, computer vision, automation and robotics, Geography, digital design, manufacturing engineering, research methods, work location, building materials, computing systems, data collection methods, business, industry analysis, organizational analysis, data management, occupational health and safety management, management, concrete and cementitious materials, performance management
Topics: Geographical Context, Engineering Principles, Health and Safety, Sustainability, Quality Management, Research Practice, Construction Materials, Information Management, Business Strategy, Roles and Professions, Human Resources, Digital Applications, Organizational Design, Site Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here