Ekyalimpa, Ronald (2015) A distributed simulation approach for contractor company performance management in the construction industry. PhD thesis, University of Alberta, Canada.
Abstract
Acquiring and sustaining an edge over competitors in an era that is characterized by more complex and massive projects, scarce resources, more stringent client requirements, and higher expectations from board members is quite challenging for construction companies. It is believed that implementing sound performance management systems is effective in overcoming this challenge. Traditional performance management techniques such as the Balanced Score Card (BSC), Key Performance Indicators (KPIs), Data Envelopment Analysis (DEA), etc. have been in use, but showed a number of problems. Examples include: they are self centered, data driven, tedious to use and lagging. To overcome the problems with traditional performance management systems, a number of simulation-based systems were created. These also had their shortfalls. For example they did not model the project arrival process and competitive work acquisition process explicitly. They also did not model the work execution process and performance measure generation process in detail. This thesis study set out to advance the state-of-the-art of simulation-based performance management systems. Real world constructs that relate to the business operations of a typical construction company were abstracted and represented using different simulation paradigms. For example, the competitive work acquisition process was modelled using an agent-based approach because of the interaction that exists between autonomous or semi-autonomous and concurrently self-executing constructs. On the other hand, the execution of awarded projects at the companies was emulated using a Discrete Event Simulation (DES) modeling approach. The agent-based model was developed using the AnyLogic simulation system while Simphony and Visual Studio were used for developing the DES model. Subsequently, these two components were configured into High Level Architecture (HLA) federates and integrated to form a distributed simulation system using a distributed simulation framework known as COnstruction SYnthetic Environment (COSYE). A simulation-based performance management application was developed in this study. A number of insights were gained in the course of developing the application. For example, robust design patterns and system architecture were used that could be applied in solving other similar complex problems. Also, a number of approaches were devised for effectively modeling different ill-structured phenomena (such as safety and quality) that exist within the construction domain. Verification and validation work done on the developed application proved that the application was reliable and realistic.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | system architecture; key performance indicators; safety; client; simulation; validation |
| Index terms: | agent, system architecture, state of the art, validation, studio, performance measure, construction company, interaction, modelling, data envelopment analysis, construction industry, robust design, paradigm, client requirements, acquisition, performance management, discrete event simulation, key performance indicator |
| Subjects: | business, design methods, modelling and simulation, project delivery, data analysis and analytics, performance measurement, education and knowledge transfer, professional development, industry analysis, organization, design theory, construction type, research dissemination and communication, practitioner, analytical methods, behavioral psychology |
| Topics: | Construction Technology, Roles and Professions, Information Management, Research Practice, Business Strategy, Design Practice, Engineering Principles, Project Management, Quality Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here