Factors that influence project team members to use BIM and IDDs in the construction industry

Markovic, P B (2015) Factors that influence project team members to use BIM and IDDs in the construction industry. DM thesis, University of Phoenix, USA.

Abstract

The purpose of this mixed-methods triangulation research study was to discover factors that influence project teams to use building information modeling (BIM) and integrated design and delivery solutions (IDDS) in construction projects, determine the reasons for slow acceptance of IDDS and BIM by project team members, identify necessary process changes for faster acceptance and use of IDDS and BIM by all project team members in the construction industry, and recommend solutions. The value of the construction industry globally is $5. 6 trillion (McGraw-Hill Construction, 2012a). The organizational structure in the construction industry is rigid and top down, which does not easily permit fast acceptance and seamless use of the latest technology. The construction industry requires open communication, close relationships, expert knowledge, experience, and teamwork among all participants and stakeholders (Sumner & Slattery, 2010). The mixed-methods research study involved collecting data through administrating a Web- based survey with closed- and open-ended questions sent to professionals in the construction industry. The study included simultaneously combined qualitative and quantitative phases. The quantitative and qualitative findings indicated the following factors influence the use of IDDS and BIM by project team members in the construction industry: project requirements, cost, project schedule, project complexity, and BIM and IDDS benefits awareness. Reasons for slow acceptance were lack of software knowledge, BIM and IDDS complexity, and slow learning process. The needed process changes identified were making IDDS and BIM project request-for-proposal and contract requirements. IDDS and BIM requirements should become new construction industry standards to ensure getting quality projects professionally done on time and budget.

Item Type: Thesis (Doctoral)
Thesis advisor: Baugh, J B
Uncontrolled Keywords: complexity; project team; construction project; standards; building information model; building information modeling; communication; learning; teamwork; professional; stakeholder; organizational structure
Index terms: construction industry, project team, process change, building information modelling, teamwork, complexity, triangulation, project complexity, construction project, survey, proposal, organizational structure
Subjects: management, industry analysis, systems engineering, information systems, sociology, data collection methods, research design and methodology, project delivery, organizational theory, production management, project planning
Topics: Project Management, Engineering Principles, Digital Applications, Organizational Design, Research Practice, Business Strategy
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here