Developing an interface management (im) model for construction projects

Weshah, N A (2015) Developing an interface management (im) model for construction projects. PhD thesis, University of Calgary, Canada.

Abstract

Interface management (IM) is a main factor in the success of construction projects. Although there is no agreement about the definition of interfaces and IM, many researchers discuss the boundary conditions between tools, phases, systems, physical elements/components, people, organizations, and other elements. For the last two to, three decades there has been less than necessary awareness of the essentials of IM and the severity of interface problems, and this has negatively affected project performance. Failure to properly manage interfaces impacts project performance as defined by scope control, quality, schedule, cost, safety, and resources. The objectives of this study are twofold: (a) enhancing the IM among different project participants involved in the construction projects and (b) increasing the effectiveness of IM throughout the project lifecycle, focusing specifically on the engineering/design phase. The study uses both qualitative and quantitative approaches (mixed methods) to investigate, identify, and classify interface problem factors in construction projects.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: failure; lifecycle; safety; project performance; construction project
Index terms: lifecycle, project performance, effectiveness, design phase, mixed method, boundary condition, project lifecycle, interface management, interface problem, construction project, scope control
Subjects: production management, structural engineering, engineering problems, project completion, professional practice, project management theory and practice, performance management, control systems, data collection methods, business, project delivery
Topics: Quality Management, Engineering Principles, Project Management, Design Practice, Business Strategy, Research Practice
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here