Zhang, D (2015) An analysis of building information modelling (BIM) implementation from a planned behavior perspective. PhD thesis, University of Hong Kong, Hong Kong.
Abstract
Lack of accurate building information and communication between project teams have been identified as two major problems for the construction industry, which led to inefficient building operations. In recent years, Building Information Modelling (BIM) emerges as an attractive solution to resolve these problems. However, the implementation of BIM in practice has encountered obstacles. The adoption rate of BIM varies and BIM fails to meet the core expectation of reinforcing the inter-disciplinary collaboration. Although research has been conducted to explore both technical and non-technical issues that need consideration, few studies stressed the significance of individual professionals during the implementation process. This study aims to complement this insufficiency by investigating individual professionals’ positive role in facilitating successful BIM implementation. The study presented in this dissertation follows a mix-method approach. To identify an appropriate research perspective and explore the research context in Hong Kong construction industry, the researcher firstly conducted an exploratory case study and a more comprehensive literature review. Explicit research questions are then developed from the perspective of change management. Two models from Information system(IS)and organizational development literature were integrated to serve as theoretical framework. A tentative research model is then developed by incorporating key variables identified from the exploratory case study into this theoretical framework. In the following questionnaire survey, a total of 125 completed questionnaire were collected through email and online survey system. Partial Least Squares-Structural Equation Modeling (PLS-SEM) technique is adopted to test the hypothesized relationships between variables in the tentative research model. Findings from the exploratory study suggest that BIM is widely accepted by professionals as a technology initiative and the BIM implementation involves both technological and organizational changes. It is also found that individual professionals’ reactions were largely influenced by the unique processes and contexts BIM is implemented. These reactions will in turn re-shape the implementation processes and contexts and thus mediate the impact of BIM implementation on project performance. The results from the survey confirm the significant role of four influential factors (i.e. individual job impact, frequency of change communication, quality of change communication and participation) in shaping individual professionals’ positive beliefs and attitude toward BIM. Accordingly, three useful strategies are recommended to better manage the individual professionals’ positive change beliefs toward BIM and thus create positive change atmosphere for further BIM implementation in Hong Kong. The study has contribution to both knowledge and practice. Firstly, this study contributes to the knowledge by (1) extending the understanding of BIM from a change perspective; (2) providing rich information of BIM implementation in practice especially in the context of Hong Kong; and (3) complementing the insufficiency of BIM research at the micro-level (i.e. the individual level). Secondly, this study contributes to the practice by (1) recommending three useful strategies to create positive change atmosphere for BIM implementation at the primary stage; and (2) enabling more analyses of key influential factors at any implementation stage by incorporating various antecedents into the theoretical framework.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | building information modelling; building operations; change management; collaboration; communication; organizational development; participation; Hong Kong; project performance; case study; questionnaire survey; organizational change |
| Index terms: | project performance, planned behaviour, project team, implementation, construction industry, dissertation, case study, Hong Kong, building information modelling, organizational development, questionnaire, influential factor, collaboration, building operation, information system, partial least square, organizational change, survey, exploratory study, change management, strategy, structural equation modelling, literature review |
| Subjects: | behavioral psychology, research methods, Geography, contractual arrangements, research dissemination and communication, industry analysis, information systems, statistical analysis, management, project management theory and practice, data analysis and analytics, project delivery, data collection methods, risk assessment, business |
| Topics: | Geographical Context, Project Management, Risk Management, Procurement, Business Strategy, Research Practice, Digital Applications, Organizational Design |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here