A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery

Krystallis, I (2016) A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery. PhD thesis, Loughborough University, UK.

Abstract

This research assessed the concept of future-proofing (FP) as a proactive initiative for enterprise asset management is an urgent need against uncertainty, particularly in health care due to unforeseeable demographic shifts and rapid advances in medical technology. Building information modelling (BIM) is a data-driven initiative but a rigorous analysis will indicate that a synergy exists. A multiphase design methodology was adopted to cover as much breadth and depth around the synergies that exist between future-proofing and BIM both in terms of delivery (supply chain) and in an enterprise context (organisational structures). In the first phase, an exploratory survey was conducted. The exploratory data were gathered to include responses of industry experts. The findings provide valuable insights regarding the integration of flexibility and design standardisation and whether this integration can improve change-readiness in designing future-proof healthcare facilities. Then, a first round of primary and secondary case study data were gathered from a major public asset owner organisation. The findings focused on the governance of BIM and FP in an enterprise context. As such three agendas emerged, namely government, strategic management and, due to the opportunities that BIM brings, information management. Then, a second round of primary qualitative data were collected and a series of interviews were conducted. The interviews targeted the opinion of leading industry experts across all phases of a project. At this phase the aim was to develop a classification ontology of the interactions between FP and BIM during project delivery. Finally, the findings were triangulated. As such, a reference model was developed, concentrating on the functional and organisational aspects of the core business of a service organisation. Finally, the three types of findings were connected to give a deployment plan for future-proofing asset management taking into account adoption of innovation which service providers can use to manage their assets across an enterprise.

Item Type: Thesis (Doctoral)
Thesis advisor: Price, A and Demian, P
Uncontrolled Keywords: asset management; building information modelling; governance; government; healthcare; integration; design method; uncertainty; case study; organisational structure
Index terms: owner, governance, case study, core busines, building information modelling, synergy, project delivery, organizational aspect, design method, interaction, health care, standardization, ontology, survey, asset management, organizational structure, interview, strategic management, methodology, integration
Subjects: information systems, sociology, organizational analysis, partnership management, public and environmental health, education and knowledge transfer, management, performance measurement, project delivery, design methods, business, data collection methods, behavioral psychology, asset management, research methods
Topics: Quality Management, Procurement, Health and Safety, Organizational Design, Digital Applications, Design Practice, Stakeholder Management, Governance, Business Strategy, Research Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here