Relationship between budget and project success factors in the Ghanaian building construction sector

Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.

Abstract

In developing countries, 60% of project management professionals appear to lack knowledge that timely completion, budget fidelity, and high quality are critical success factors for completion of construction initiatives. Based on the theories of iron triangle, accident causation, scientific management, and strategic management, the purpose of this correlational study was to examine the relationship between project budget and the independent variables of time, quality, safety, environmental impact, and site disputes in the Greater Accra Region of Ghana. One hundred and sixteen project managers, randomly selected from the population of construction professionals in the Greater Accra Region of Ghana, completed the survey entitled the Six Key Performance Indicators developed by Ngacho and Das (2014). The results of the multiple linear regression analysis indicated a weak positive correlation exists between the independent variables (time, quality, safety, environmental impact, and site disputes) and project budget, F(1, 114) = 37.08, p < 0.001. Time recorded the highest beta (0.50) followed by site dispute (0.29), environment (0.22), quality (0.06), and safety (0.04). Attention to key performance indicators associated with time, dispute, and environmental impact could improve project outcomes in the Ghanaian construction sector. The study findings could be useful to improve the quality of projects and may benefit the lives of professionals and community members in the area.

Item Type: Thesis (Doctoral)
Thesis advisor: de Souza, L
Uncontrolled Keywords: budget; environmental impact; quality; safety; site dispute; time; contract administration; contract management; organizational behavior
Index terms: construction professional, regression analysis, project management, contract administration, key performance indicator, project manager, project success, independent variable, dispute, scientific management, project outcome, organizational behaviour, Ghana, population, strategic management, environmental impact, critical success factor, construction sector, Accra, developing country, contract management, building construction, survey
Subjects: project completion, environmental impact, building construction, demography, development economics, contract management, Geography, project delivery, business, data collection methods, profession, dispute resolution, control systems, statistical analysis, industry analysis, management, professional development, project management theory and practice
Topics: Geographical Context, Project Management, Sustainability, Legal Issues, Business Strategy, Information Management, Research Practice, Roles and Professions, Construction Technology, Urban Studies, International Construction, Contract Administration, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here