The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE

Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.

Abstract

This research critically analyses and compares how the United Arab Emirates (UAE)1 Law and English and Welsh (EW) Law regulates obligations in a contract, for a thing that is to come into existence in the future, namely a construction contract. Uncertainty/speculation as to how an obligation is to be performed in UAE Law is termed gharar. The word that is synonymous with this terminology in EW Law is 'risk'. The extent of gharar or ‘risk' (these terms are used on an interchangeable basis in this thesis) in an obligation plays a fundamental role in the profitability of a construction contract. Where losses become unacceptable, particularly for the Contractor, a dispute will arise. These circumstances may be in conflict with UAE Law, which obligates parties to a contract to ensure circulation of wealth by maintaining the anticipated profit to be made from a contract. This analysis also reviews how the level of gharar or ‘risk' can be increased by operation of two types of provision that are included in standard forms of construction contract such as the International Federation of Consulting Engineers, Geneva, Switzerland (FIDIC) Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer 1st Ed. 1999 (FIDIC99). The first is a provision that releases the Employer from liability where the Contractor does not give timely notice of an Employer’s act of prevention. The second is a provision giving the Employer a discretion to act in an opportunistic manner, and exempt or limit his liability. It considers how FIDIC99 should be applied to control gharar or ‘risk' in a positive way. It also identifies similarities between how UAE Law controls gharar and that of the notion of parties' reasonable expectations in contract Law (herein referred to as parties' expectations), and how relational contracts operate to ensure parties achieve their expectations.

Item Type: Thesis (Doctoral)
Thesis advisor: Auchie, D P
Uncontrolled Keywords: conflict; contract law; dispute; FIDIC; liability; Switzerland; uncertainty; United Arab Emirates
Index terms: profit, Dubai, consulting engineer, circulation, liability, United Arab Emirates, Switzerland, dispute, FIDIC, contract law, prevention, construction contract, profitability
Subjects: dispute resolution, profession, contract law, contract type, standard forms of contract, economic analysis, Geography, financial risk, urban design, liability law
Topics: Urban Studies, Roles and Professions, Cost Management, Business Strategy, Legal Issues, Procurement, Geographical Context
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here