BIM assisted design process automation for pre-engineered buildings (PEB)

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Abstract

The effective adoption and implementation of Building Information Modeling (BIM) is still challenging for the construction industry. However, studies and reports show a significant increase in the rate of BIM implementation and adoption in mainstream construction activities over the last five years. In contrast, Pre-Engineered Building (PEB) construction, a specialized construction system which provides a very efficient approach for construction of primarily industrial buildings, has not seen the same uptake in BIM implementation and adoption. The thesis reviews the benefits and the main applications of BIM for the PEB industry as well as challenges of its practical implementation. To facilitate the implementation of BIM in the PEB industry, a BIM framework is adapted from Pre-fabrication (Pre-fab) industry and new workflows, process maps, and data-exchange strategies are developed. As the PEB industry traditionally makes significant use of automation in its design and fabrication process, accordingly this work investigates the technical challenges of incorporating automation into the proposed BIM process. Two new BIM concepts, “Planar Concept” and “Floating LOD”, are then developed and implemented as a solution to these challenges. To define the proper input/output criteria for automated BIM design processes, a numerical study was performed to identify an “Optimum LOD”. A software implementation embodying the research outcomes was developed to illustrate the feasibility of the results. Its step-by-step deployment is analyzed and discussed using an example industry PEB design project. Further, the impact of this work is extended by integrating the developed BIM framework and automated design process with wind engineering design activities and tools and procurement systems. The study concludes that the deployment of the proposed BIM framework could significantly address existing issues in project design through to operation processes found in the PEB industry. Also, the results indicate the developed concepts have the potential for supporting the application of automation in the other sectors of the general construction industry. This thesis is written using the "Integrated Article" format and includes various complementary studies.

Item Type: Thesis (Doctoral)
Thesis advisor: Bitsuamlak, G T and Dickinson, J K
Uncontrolled Keywords: construction activities; automation; building information modeling; fabrication; workflow
Index terms: construction activity, building information modelling, project design, automation, implementation, construction industry, fabrication, engineering design, procurement system, strategy, maps, design process, workflow, construction system
Subjects: building construction, design process, automation and robotics, spatial and geospatial analysis, manufacturing engineering, contractual arrangements, construction operations, information systems, industry analysis, management, design methods
Topics: Site Management, Digital Applications, Design Practice, Research Practice, Business Strategy, Procurement, Engineering Principles
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here