Effects of contract procurement factors on performance of transportation projects

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Abstract

Cost and schedule savings are the main measures of a project's success. Several factors affect the cost and schedule performances in a construction project, such as design changes, material, labor and equipment shortages, unpredictable weather conditions, and errors & omissions in contract documents. Some studies have shown that either the construction cost or the schedule performance of a project was dependent on the procurement factors, namely: bid cost, number of bidders, the bid cost deviation between the first and second bidder, the liquidated damage rate per day, the type of a contract, and the project location. However, a comprehensive study on the combined effect of procurement factors on performance metrics has not been yet conducted. Therefore, this study collected all the available contract procurement factors to determine the combined effect of these factors on the construction cost and the schedule performances. In addition, the multiple linear regression models within the study were developed to predict the performance metrics based on these factors. For this study, the project data completed between the year 2000 and 2016 were collected from two state department of transportations (DOTs): Texas and Florida. The results showed that not only cost growth but also schedule growth had a significant correlation between the liquidated damage rate per day, the type of a contract funding, the type of a contractor, and the location of a project. The validation process showed that the models developed during this study could predict project performance metrics accurately. Further research is recommended with more state DOTs data to check whether the relationships between the procurement factors and project performance metrics are similar to those found in this study.

Item Type: Thesis (Doctoral)
Thesis advisor: Shrestha, P P
Uncontrolled Keywords: construction cost; construction project; equipment; funding; project performance; weather; validation
Index terms: number of bidders, performance metric, schedule performance, transportation project, design change, project data, construction project, validation, contract document, shortages, weather, regression model, cost deviation, construction cost, savings, funding, bidder, schedule growth, project performance
Subjects: infrastructure and transport systems, statistical analysis, project controls, contractual condition, project management theory and practice, professional development, performance measurement, financial and cost management, data collection methods, air quality, production management, contractual arrangements, bidding, economic analysis
Topics: Research Practice, Information Management, Business Strategy, Cost Management, Time Control, Contract Administration, Project Management, Engineering Principles, Procurement, Sustainability, Quality Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here