Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Abstract

This dissertation is designed to explore the use of partnering as a decision tool for improving highway construction project performance regarding the project delivery method used by the transportation agencies. Project partnering was implemented in response to project performance issues that are often caused by the adversarial relationships that characterize the industry. Partnering is a tool to improve relationships by providing a framework for open communication and joint problem solving whose goal is to obtain win/win outcomes. Despite the widespread use of partnering, the literature review did not reveal previous research that quantifies the costs and benefits of implementing partnering over an extended period of time. The following three issues are of primary concern to all public transportation agencies during project development and delivery: (1) selecting the appropriate project delivery method, (2) maximizing project cost/time certainty while minimizing disruptions due to disputes, and (3) ensuring proactive project quality management while creating a safe environment for both workers and the traveling public. The increased use of alternative project delivery methods has caused the above issues to become increasingly interrelated and created a project management challenge for state departments of transportation (DOT). Not only do these projects allow concurrent design and construction, but they also move at a faster pace, which demands a much higher degree of both integration and active collaboration to meet the demands of an aggressive schedule. Initially implemented by the Arizona DOT in 1996, partnering has been found to be an effective tool for creating the necessary atmosphere for honest, information-rich communication between the owner and its design consultants and construction contractors. However, the American Association of State Highway and Transportation Officials (AASHTO) Partnering Handbook was published in 1998 based only on traditional low bid project delivery and as such does not include guidance for partnering projects delivered using alternative contracting methods (ACM). This dissertation aims to contribute to the body of knowledge in partnering by extending the understanding of project level partnering, and documenting effective practice found in the research to the program level. This will be achieved by answering the following overarching research question: Are there quantifiable benefits for implementing project level partnering practices that can be accrued by institutionalizing the principles of partnering at the program level? The research findings will also have practical implications for transportation agencies which will address that gaps in current knowledge through the following objectives: develop decision-making procedures to select projects to be delivered using partnering based on their project performance metrics; develop a framework procedure to measure the impact of partnering practices; developing guidance for partnering projects delivered using ACMs; and develop a partnering organizational maturity model to identify potential areas of improvements at program level.

Item Type: Thesis (Doctoral)
Thesis advisor: Gransberg, D D
Uncontrolled Keywords: contracting methods; construction project; highway; collaboration; communication; disputes; integration; partnering; problem solving; project cost; project delivery; quality management; construction contractors; construction contractors; consultant; owner; project performance
Index terms: highway construction, project performance, design and construction, project development, dissertation, quality management, project management, project delivery, partnering, maturity model, dispute, owner, transportation agency, public transportation, construction project, collaboration, program, integration, decision-making, problem solving, contracting method, agency, construction contractor, body of knowledge, literature review, project cost
Subjects: organizational analysis, partnership management, sociology, decision analysis, infrastructure and transport systems, management, civil engineering, economics, software systems, project management theory and practice, data analysis and analytics, project delivery, dispute resolution, transportation engineering, quality assurance, decision-making and reasoning, production management, evaluation, contractual arrangements, knowledge management, research dissemination and communication, practitioner
Topics: Legal Issues, Quality Management, Engineering Principles, Project Management, Risk Management, Procurement, Digital Applications, Urban Studies, Organizational Design, Cost Management, Information Management, Research Practice, Stakeholder Management, Roles and Professions
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here