Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.
Abstract
Knowledge management is a broad concept that has been investigated in many disciplines. Tacit knowledge management is more important in construction industry where common issues exist between the design and construction phase. However, most knowledge is embedded in the minds of professions and based on experiences they achieved from project. The successful completion of a project requires a rigorous understanding of each stage of project lifecycle that can be enhanced through integrating knowledge between project members, in terms of capturing and sharing knowledge between project members, and transferring it to the next project. Due to the temporary nature of construction projects, people who work on these project tend to disperse after completion of the project. This means the knowledge and experiences they achieved through project will be wasted, if it is not captured and shared structurally across project. Within this context, the failure to integrate knowledge will result in increasing the possibility of ‘reinventing the wheel’, which means spending more time and cost. The rational that led to this study came as a result of increasing interest in the need for tacit knowledge integration, in terms of capturing, sharing and transferring knowledge, especially within construction project undertaken through the traditional procurement system, because this system is based on the separation of the design and construction phase.The aim of this research is to develop a framework on how to integrate tacit knowledge in terms of capturing, sharing and transferring, within a construction project undertaken through the traditional procurement system. This is done through conducting documentary survey, experts’ survey and case studies sample within the UK construction industry. The documentary survey was used to form researcher’s background information and develop a conceptual framework which would be then taken to real life situation to investigate, gather relevant information and understand the perceptions and values of stakeholders in using knowledge integration within construction projects. Furthermore, an experts’survey (expert’s interviews) was used to collect qualitative data through interviews with four experts. These experts were from both academia and industry, and they were selected based on their experiences and engagement in the traditional-based construction projects. Multiple-case holistic design was selected for conducting this research, in order to provide credibility to the research outcome. There is only one unit of analysis that is needed to study in order to explore the approaches and techniques that were used by construction organisations for tackling challenges in the process of tacit knowledge integration. Two case studies were selected to reflect the building sector within construction industry. The projects were complex, large and costs over £5m. The selected case studies differ in that one of them is completed project and the other is an ongoing project at construction phase. As most of the problems and errors occurred in project lifecycle are related to designing phase, the cases were selected from same organisation involved at designing phase in order to analyse and compare the process of knowledge integration. Furthermore, an online open-end questionnaire was conducted to collect experts’ opinion on the developed framework.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Pathirage, C |
| Uncontrolled Keywords: | failure; tacit knowledge; construction phase; integration; knowledge management; lifecycle; UK; case study; construction project; stakeholder; interview |
| Index terms: | survey, interview, conceptual framework, tacit knowledge, knowledge management, integration, construction project, questionnaire, project lifecycle, traditional procurement, construction organization, case study, traditional construction, construction industry, knowledge integration, construction phase, profession, academia, design and construction, lifecycle, procurement system |
| Subjects: | project delivery, data collection methods, organizational analysis, educational institutions, industry analysis, professional development, contractual arrangements, organization, project completion, institututions, heritage and conservation, theoretical framing, production management |
| Topics: | Information Management, Research Practice, Business Strategy, Roles and Professions, Design Practice, Organizational Design, Project Management, Procurement, Education |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here