Construction project performance improvement through radio frequency identification technology application on a project supply chain

Wang, H (2017) Construction project performance improvement through radio frequency identification technology application on a project supply chain. PhD thesis, Purdue University, USA.

Abstract

Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects’ supply chain and determined that RFID technology can improve the performance of construction projects. The focus of this research is on the performance impact of RFID on the project schedule through the integration of this technology into the project supply chain. RFID technology is widely used in many industry sectors and it has become the subject of research studies on the construction industry too. However, the majority of these studies investigated the technical feasibility of RFID application and simply extended the technical feasibility into potential cost savings. This research instead brings RFID application into the context of a construction project’s supply chain. The construction supply chain suffers from uncertainties that shows up as material unavailable cases such as delayed materials, missing and defective materials. This research proposes that these uncertainties can be mitigated by applying RFID technology to the construction supply chain and the project performance can be improved. Industry practices were surveyed to establish a typical industrial construction supply chain model. Simulations of the typical model were conducted to demonstrate the effect on project performance by applying RFID technology. A real world construction project was also studied and actual effect of RFID application and the construction supply chain were examined accordingly. The findings concluded that RFID technology provided timely material availability information and improved the supply chain on-time performance and had the potential to improve the construction project schedule performance.

Item Type: Thesis (Doctoral)
Thesis advisor: Hubbard, B J
Uncontrolled Keywords: construction supply chain; radio frequency identification; integration; performance improvement; productivity; project performance; construction project; simulation
Index terms: integration, time performance, construction project, industry sector, schedule performance, performance improvement, construction supply chain, project performance, industrial construction, construction industry, cost saving, radio frequency identification, productivity
Subjects: digital technology, building construction, production management, construction logistics, industry analysis, organizational analysis, project controls, project management theory and practice, economics, management, performance measurement
Topics: Engineering Principles, Project Management, Supply Chain Management, Quality Management, Research Practice, Business Strategy, Cost Management, Organizational Design, Time Control, Digital Applications
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here