Optimisation of mechanised maintenance management of railway track infrastructure

Zaayman, L (2017) Optimisation of mechanised maintenance management of railway track infrastructure. PhD thesis, University of Johannesburg, South Africa.

Abstract

Railway track infrastructure is a complex system consisting of various subsystems which require incremental maintenance from all engineering disciplines; all of whom are competing for the limited time and number of available maintenance windows.The constant demand for higher traffic volumes, increased train speeds and heavier axle loadings all result in an exponential increase in maintenance requirements but the time available for maintenance is as a result even further reduced. This requires a more scientific lifecycle approach to infrastructure maintenance management. It also requires increased performance from mechanised construction, maintenance and renewal machines to keep the infrastructure reliable, available, maintainable, affordable and safe within the short windows. The objectives of this thesis are to address the optimisation of infrastructure maintenance management and to provide a model with selection criteria for maintenance machinery and their features for the prevailing circumstances.

Item Type: Thesis (Doctoral)
Thesis advisor: Pretorius, J H C and Veit, P
Uncontrolled Keywords: optimisation; railway; railway track; traffic; lifecycle; maintenance management; renewal; selection criteria
Index terms: loading, selection criteria, lifecycle, maintenance management, window, complex system, renewal, railway track
Subjects: project delivery, construction operations, tendering, renovation and retrofit, infrastructure and transport systems, architectural elements, systems engineering, maintenance engineering
Topics: Project Management, Engineering Principles, Procurement, Design Practice, Business Strategy, Site Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here