An integrated total quality management model for the Ghanaian construction industry

Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Abstract

This research project investigated and modelled Total Quality Management (TQM) for the Ghanaian construction industry. The primary aim of the research was to model the extent to which Leadership/Top Management features, Company Supplier Quality Management features, Client Focus and Involvement features, Company Quality System Evaluation features, Company Vision and Plan Statement features, Product Design Management features, Product Selection Management features, Construction Process Management and Improvement features, and Construction Employees’ Involvement and Motivation features predict TQM for the construction industry, these factors being classified as the exogenous variables. Mixed-methods research which involved both Qualitative and Quantitative approaches was adopted for the study. Empirical data was collected through a Delphi study and a field questionnaire survey. Analysis of results from the Delphi study was done with Microsoft Excel to output descriptive statistics. A conceptual integrated TQM for the Ghanaian construction industry model was based on the theory developed from literature review findings and the Delphi study. A questionnaire survey was conducted among the top management working in the construction industry in Ghana. From the 641 sample questionnaires, 536 questionnaires were returned which represents 83. 62 per cent. An exploratory factor analysis (EFA) was conducted on the initial eight-factor constructs and their variables to determine their reliability for their inclusion in the confirmatory factor analysis (CFA). Nine-factor constructs were realized after the EFA factor loading test. Further, CFA was conducted on these nine-factor constructs using structural equation modelling (SEM) software with Eqations (EQS) version 6. 2 software programme to validate and determine their reliability and inclusion in the final model. Findings from the literature on TQM studies revealed the theory that TQM implementations and practices and the latent variables lead to TQM in the construction industry. Findings from the Delphi study revealed that several factors (Leadership/Top Management features, Company Supplier Quality Management features, Client Focus and Involvement features, Company Quality System Evaluation features, Company Vision and Plan Statement features, Product Selection and Design Management features, Construction Process Management and Improvement features, and Construction Employees’ Involvement and Motivation features) were considered to be the most important determinants of TQM in the Ghanaian construction industry. Both findings revealed that TQM could be considered as an eight-factor model defined by the influence of TQM practices and experts in construction. . .

Item Type: Thesis (Doctoral)
Thesis advisor: Thwala, W D and Aigbavboa, C O
Uncontrolled Keywords: 15/09/2022
Index terms: Ghana, construction employee, Delphi method, statistics, loading, implementation, determinant, quality management, construction industry, motivation, programme, confirmatory factor analysis, survey, structural equation modelling, literature review, product design, exploratory factor analysis, total quality management, questionnaire, construction process, design management, top management
Subjects: industry analysis, statistical analysis, project controls, management, data analysis and analytics, evaluation methods, data collection methods, risk assessment, mathematical modelling, quality assurance, building construction, Geography, design process, innovation and technology management, contractual arrangements, construction operations, psychology, practitioner
Topics: Site Management, Organizational Design, Time Control, Human Resources, Design Practice, Roles and Professions, Research Practice, Quality Management, Procurement, Risk Management, Geographical Context, Engineering Principles
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here