Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.
Abstract
The study’s objective was to determine if competition during bidding directly affects the end results for State DOT projects. Competition was measured as the number of bidders per bid, and end results were measured as cost overrun and time delay percentages at project completion. State DOTs use a recursive bidding process, a standard project management practice, and they record and archive results in a similar fashion, all according to FHWA regulations. There is therefore a well-built data set for both bid results and final project outcomes which is made available to the public, on-line, by several State DOTs. By accessing public websites, data from five of those State DOTs was utilized in the study, which contained 2,457 certified bid results and 1,040 project outcomes. Two statistical models were developed using Multinomial Logit Regression (MLR) and Three Stage Least Squares Regression (3SLS) techniques. The MLR model was developed to provide estimates of the relative importance of bid-phase competition in predicting bid quality. The results showed that the likelihood of achieving an acceptable, versus an unfavorable bid result, was increased by 4. 9x with each additional bidder per bid. The 3SLS model was developed to assess the influence of bid phase competition on project cost overruns and time delays. The results showed that each additional bidder per bid resulted in a 2. 2 percent reduction in project cost overruns. Both results are significant, as the models showed that as competition increases, the probability of high quality bids and better project outcomes is enhanced. Based on these results, it is recommended that State DOTs consider the existing competitive environment before implementing alternative project delivery methods like Design-Build, or procurement strategies such as Project Labor Agreements, which artificially limit competition.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Mohan, S |
| Uncontrolled Keywords: | competition; bidding; project cost; project delivery; project management practice; regulation; probability |
| Index terms: | project delivery, procurement strategy, overrun, relative importance, competition, estimate, project outcome, bidding, regulation, cost overrun, multinomial, statistical model, project management practice, time delay, project cost, agreements, bidder, number of bidders |
| Subjects: | bidding, risk assessment, project controls, contract formation, project management theory and practice, project delivery, market analysis, data science, economics, project completion, political science, statistical analysis, contractual arrangements, financial and cost management |
| Topics: | Project Management, Research Practice, Time Control, Governance, Contract Administration, Cost Management, Risk Management, Procurement |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here