Building information modeling-based process transformation to improve productivity in the Singapore construction industry

Liao, L (2018) Building information modeling-based process transformation to improve productivity in the Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Abstract

Productivity is suboptimal and building information modeling (BIM) implementation has been mandated in building projects in Singapore. However, compared with integrated project delivery, current industry delivery involves many non-value adding (NVA) activities. This study aims to develop a model to help project teams enhance BIM implementation and reduce NVA activities and wastes. Four BIM implementation readiness (BIMIR) statuses were defined, and a sub-model was proposed based on the NVA activities to assess the status. Through two questionnaire surveys and one case study, this study found that increasing BIMIR status reduced wastes and improved productivity, and identified critical hindrances and drivers to full BIM implementation which were interpreted by a proposed organizational change framework. Based on the above analysis, a comprehensive BIM-based process transformation model was developed to evaluate BIMIR and provide managerial strategies, with priorities, for teams of different BIMIR statuses to move towards full BIM implementation and improve productivity.

Item Type: Thesis (Doctoral)
Thesis advisor: Lin, T A
Uncontrolled Keywords: organizational change; building information modeling; integrated project delivery; project delivery; Singapore; productivity; case study; project team; questionnaire survey
Index terms: survey, strategy, integrated project delivery, organizational change, questionnaire, transformation, productivity, case study, building information modelling, Singapore, project team, project delivery, implementation, construction industry
Subjects: contractual arrangements, Geography, project delivery, business, data collection methods, information systems, industry analysis, management
Topics: Procurement, Project Management, Geographical Context, Business Strategy, Research Practice, Organizational Design, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here