Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.
Abstract
(Embargoed until 1 Jan 2400) Construction progress monitoring allows schedule and/or cost deviations to be identified early enough to effectively implement corrective actions. At least 77% of transportation projects experience cost overruns, and as much as 75% of these overruns have been attributed to “real” construction management factors like progress monitoring. Progress is measured on road construction sites in terms of completion percentages at various activity and work package levels. This percentage is then used to identify schedule deviations and support the earned value analysis often used as the baseline for contractor progress payments. Unfortunately, the current methods for producing these completion percentages are not as correct or time efficient as they should be to enable effective project control. The objective of this research is to develop, test, and validate a novel solution for automatically producing completion percentages and progress status determinations that are more correct and time efficient than those generated in current practice. The proposed solution seeks to automatically detect incremental progress on road design layers in 3D as-built point cloud data generated using unmanned aerial photogrammetry and a novel data simulation approach. A parallel as-planned progress estimate is also automatically prepared using 4D information, and the progress status determinations are made by comparing the two results. This solution was tested on 15 datasets (13 simulated and 2 real-world) representing a variety of road designs and progress conditions. The method achieved an average 95% F1 score in layer detection on the real-world data, and mostly outperformed current practice in correctness. The automated processing of as-built and as-planned data to produce the progress estimate took 12 seconds for the real world data, which was indeed faster than the current practice equivalent. Although the research objectives were met, there remains room for further improvement, particularly in regards to the solution’s robustness to occlusions on the monitored surfaces.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | construction site; improvement; monitoring; payment; project control; road construction; simulation |
| Index terms: | dataset, cost overrun, package, overrun, transportation project, point cloud, estimate, asphalt road construction, progress monitoring, road construction, monitoring, project control, deviation, cost deviation, earned value analysis, construction site |
| Subjects: | civil engineering, data management, infrastructure and transport systems, work location, financial and cost management, project controls, contractual arrangements, control systems, digital design |
| Topics: | Time Control, Project Management, Digital Applications, Site Management, Cost Management, Procurement, Engineering Principles |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here