Addyman, S (2019) The timing of patterning or the patterning of timing?: organisational routines in temporary organisations. PhD thesis, University College London, UK.
Abstract
Large, or mega, construction project organisations are temporary in nature and traditionally structured around a life cycle model consisting of predefined, time bound sequential stages of work that are designed to process information and reduce uncertainty. Yet as organising through projects becomes both more prevalent and challenging, it could be argued that such a model constrains our understanding and representation of what 'actually' happens beyond these deterministic structures and prescriptive routines, specifically in understanding 'how' construction project organisations transition through the predefined time boundaries of the sequential stages. This thesis contributes to this knowledge by identifying an alternative image of the life cycle model through empirically investigating the 'transition' between life cycle stages, with 'incomplete' information. It identifies a five stage 'recursive process model of transitioning' that highlights the underlying generative mechanisms involved in the (re)creation of organisational routines in managing the incompleteness associated with transitioning from one life cycle stage to the next. It presents an empirical autoethnographic case study over one year, observing a construction project organisation as it sought to transition from its design stage, through formal sanction, and into its construction stage. Informed ontologically by process metaphysics, and through challenging the underlying theoretical temporal assumptions of temporary organisations - 'newness', and organisational routines - 'repetition', it describes managing project transitions as 'dialogical action', influenced by the spatiotemporal aspects of the organising inquiry. It identifies the patterning of action within six transition routines, that when mapped over time present the five stage recursive process model of transition. Despite a successful three-year relationship in developing organisational capability between the client and the contractor in the design stage, as the pre-defined date for the commencement of the construction stage neared, there emerged a realisation of the impending uncertainty that this new stage would bring. Triggered by various formal and informal transition 'rituals', the organisations' search for, and assumptions about the 'sufficient completeness', or 'necessary incompleteness' of information led to both the effortful and emergent (re)creation in the 'patterning of dialogic action' from the design stage, into the construction stage.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | case study; client; construction project; construction stage; life cycle; project organisation; uncertainty |
| Index terms: | organizational capability, construction project, organizational routine, life cycle, temporary organization, routine, project organization, boundaries, case study, design stage |
| Subjects: | business, professional practice, production management, value management, property law, sociology, organizational theory, data collection methods |
| Topics: | Design Practice, Organizational Design, Project Management, Research Practice, Legal Issues |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here