Abstract

The construction industry in Nigeria is one of the major contributors of the Gross Domestic Product (GDP) and as such a significant section of the economy. However, the industry adopted a fragmented approach due to the procurement variants and complexity in work. Procurement has a fundamental function in the execution of building projects in the Nigerian construction, architectural, engineering and construction (AEC) industry. The research aims at developing and validating a Building Information Modelling (BIM)-enabled procurement framework by investigating the willingness of the Nigerian AEC industry to adopt a BIM-based procurement process, particularly in new buildings. Following the tenets of a pragmatic philosophy and an explanatory sequential mixed method approach, the study combined quantitative and qualitative approaches at intensive and extensive stages respectfully. At the early stage of the study, data was collected through existing literature review. Results of the literature review demonstrated that the following were issues in new buildings; abandonment, rework, poor performance, collapse, cost and time overrun, and fatalities. These issues were linked to procurement variants. Therefore, considering a collaborative technology/process such as BIM might remediate the problems. As such a questionnaire was developed based on literature review and analysed using statistical approach. As a means of validating the outcome of the conceptual framework developed, a focus group was conducted and analyse through coding. The study suggests that there were several benefits of BIM that could be realised during the procurement and the adoption could improve integration of construction stages. Furthermore, for these benefits to be comprehended, several factors had to be considered. Such as innovation, free flow of communication, trust, encouraging initiatives, focusing a collective goals and objectives. However, the uptake of BIM in the nation had several barriers that were also investigated to comprehend the phenomenon further. The study implies that the adoption of the BIM-enabled Framework could enrich both the management of new buildings and the adoption of BIM in the country. The contents of the framework should be viable for involved stakeholders when dealing with procurement issues and BIM. By implementing this framework recommended in the study, substantial progress can be obtained in the issues encountered in the construction industry.

Item Type: Thesis (Doctoral)
Thesis advisor: Abrishami Shokooh, S; Gaterell, M R and Al-Bizri, S
Uncontrolled Keywords: building information modelling; communication; complexity; focus group; gross domestic product; innovation; new build; Nigeria; procurement; stakeholders; trust
Index terms: integration, questionnaire, conceptual framework, complexity, focus group, procurement process, literature review, rework, abandonment, philosophy, fatalities, construction industry, construction stages, building information modelling, time overrun, gross domestic product, mixed method, qualitative approach, Nigeria, new build
Subjects: systems engineering, information systems, industry analysis, philosophical studies, project controls, organizational analysis, construction integration, health risk and incident analysis, project delivery, data analysis and analytics, data collection methods, completion, Geography, research methods, theoretical framing, economic analysis, contractual arrangements, operations management
Topics: Procurement, Health and Safety, Engineering Principles, Geographical Context, Project Management, Business Strategy, Research Practice, Time Control, Organizational Design, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here