Towards a BIM-enabled facility management: Promises, obstacles and requirements

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements. PhD thesis, KTH Royal Institute of Technology, Sweden.

Abstract

A substantial share of the organisations’ annual costs is associated with their facilities. A fundamental shift from a reactive facility management (FM) practice to a strategically orchestrated FM profession is thus a prerequisite for increased resource efficiency. One of the requirements for a coordinated facility management practice is information logistics. Building Information Modelling (BIM) is one of the most prominent initiatives frequently addressed by scholars and practitioners as a game-changer in construction industry in general and FM in particular. In order to fully reap the benefits of BIM in FM, however, further research is required. This study aims, therefore, to investigate the challenges against successful implementation and realizing the benefits of BIM in FM. The primary focus in this study is the FM phase; but the earlier upstream phases have also been studied due to their implications for a BIM-enabled FM. From a spatial-scale perspective, this study is mainly focused on buildings rather than other construction entities. The findings could benefit both academics and practitioners. Overall, a pragmatic research philosophy has been adopted and the main research strategy used here is case study. The current dissertation is composed of five papers. The focus of knowledge acquisition through papers alternately shifts between the applied and the theoretical. The primary theoretical grounds of the papers are the built environment management model (BEM2) (Ebinger and Madritsch, 2012) and BIM Framework (Succar, 2009). Further theories from the fields of design methodology and cognitive science have also been revisited. Paper 1 provides a theoretic basis for more focused studies on existing and desired processes in FM and their associated information transactions. In Paper 2, the current status of the building information management technologies used in FM is summarized; the prevailing issues are identified; and a number of technical solutions have been devised. Paper 3 shifts the focus back to the design phase and provides a knowledge base for developing further theoretical frameworks and conceptual models that support IT-implementation for formalized requirements management. Through Paper 4, it has been investigated how beneficial contemporary design-intent BIM deliverables could be to FM and what should be improved. The focus of Paper 5 again shifts back to the FM phase. Here, a methodology has been presented for measuring the benefits of BIM in FM using a proposed benefits realization assessment framework. Obtaining the full range of the benefits of BIM in FM, however, requires radical organizational changes and introducing new roles. Further research is needed for defining new business models that underpin and motivate such extensive organizational and procedural changes. More research should also be undertaken for enhancing data interoperability among different actors as well as among IT platforms used at different spatial scales namely BIM and GIS applications.

Item Type: Thesis (Doctoral)
Thesis advisor: Horemuz, M; Tarandi, V and Han-Suck, S
Uncontrolled Keywords: building information modelling; built environment; business model; information management; interoperability; logistics; roles; design method; efficiency; organizational change; case study; information modelling
Index terms: built environment, design phase, business model, knowledge acquisition, requirements management, profession, resource efficiency, interoperability, construction industry, implementation, design method, dissertation, case study, platform, efficiency, building information modelling, information modelling, data interoperability, practitioner, management practice, methodology, knowledge base, organizational change, benefits realization, philosophy, science, building information management, strategy
Subjects: value management, design methods, data collection methods, business, professional development, management, performance management, data exchange, infrastructure and transport systems, philosophical studies, industry analysis, information systems, systems and processes, student development, specialized education, institututions, practitioner, research dissemination and communication, professional practice, contractual arrangements, digital design, research methods
Topics: Procurement, Project Management, Education, Quality Management, Roles and Professions, Business Strategy, Information Management, Research Practice, Organizational Design, Urban Studies, Digital Applications, Design Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here