Application and effects of emerging technologies on variation minimisation in the UK construction projects

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Abstract

Delivering construction projects on time and budget is a challenge that has always plagued the construction industry in the UK. Variation is a major root cause of project cost and time overrun and one of the most controversial issues in construction contracts. The industry is, however, on the cusp of a veritable technological revolution. Modernising the industry through the implementation of appropriate emerging technologies minimised variations along with other benefits. Hence, the UK government is committed to the Construction 2025 strategy; to achieve a 33% reduction in the initial cost of construction works and 50% reduction in the overall project time. This research aims to investigate the application and effects of emerging technologies on variation minimisation in UK construction projects. The study adopted a mixed methods approach comprising literature review, semi-structured interviews, close ended survey, open-ended survey and a framework development. Participants were limited to those that have practically implemented some emerging technologies on their construction projects. Agency theory was used as a theoretical lens to address problems associated with principal-agent relationships that exist in construction contracts. The findings of this study addressed some reasons given in literature to justify the inevitability of variations on construction projects. Technologies enabled risks associated with construction project complexity, health and safety, communication issues, buildability, team fragmentation and design errors to be identified and mitigated early. Key findings revealed that BIM played a vital role in minimising variations; however, the combined effects of other emerging technologies alongside BIM are indispensable. Stakeholders can visualise a digital twin of their proposed structure and make desirable changes before actual construction activities. Implementation of appropriate technologies minimised variations on construction projects of participants. Research findings resulted in the development of a framework that suggests useful emerging technologies to implement in minimising potential variations. Barriers to adoption and implementation are surmountable. The present teething problems will extinct with further training, research and development. The construction industry in the UK is slowly advancing in its journey to modernisation. Findings of this research empirically contribute to the achievement of the commitment of the UK government to reduce construction cost and time. This research contributes to fewer studies and pioneering work that discussed variation minimisation from agency theory perspective. Findings also provide practitioners and researchers’ insight into how current practices may be improved; as well as areas where more research on variation minimisation is needed.

Item Type: Thesis (Doctoral)
Thesis advisor: Arewa, A
Uncontrolled Keywords: buildability; communication; complexity; construction cost; construction project; digital twin; government; health and safety; project cost; safety; training; variations; stakeholders; fragmentation; interview; UK
Index terms: project cost, survey, fragmentation, commitment, literature review, strategy, health and safety, buildability, minimization, interview, complexity, appropriate technology, agent, digital twin, agency, practitioner, variation, research and development, construction project, construction activity, framework development, construction cost, time overrun, design error, mixed method, construction industry, implementation, construction work, construction contract, emerging technology
Subjects: data collection methods, business, data analysis and analytics, financial and cost management, contractual condition, management, economics, industry analysis, systems engineering, project controls, sociology, practitioner, technological development, contract type, digital engineering, innovation and technology management, professional practice, construction operations, contractual arrangements, psychology, operations management, production management, health safety and environment, algorithms, design efficiency, research management
Topics: Procurement, Sustainability, Health and Safety, Project Management, Engineering Principles, Roles and Professions, Cost Management, Business Strategy, Research Practice, Time Control, Contract Administration, Organizational Design, Site Management, Design Practice, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here