Site waste management plans, the designer and the CDM principal contractor

Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Abstract

The Site Waste Management Plans Regulations 2008 (SWMP) have as their purpose the requirement for the elimination, recycling or re-use of construction waste so as to reduce the use of landfill. The results of a survey carried out to establish designers' involvement in waste reduction during the design stage shows a lack of understanding and commitment to this process. A second survey shows that information from the designer on the quantity and type of waste, which the principal contractor is expected to manage once the construction phase commences, is lacking. It is argued that as a result, any waste reduction achieved during the construction phase would be at the initiative of the CDM principal contractor, thus placing an unreasonable responsibility on him to reduce waste resulting from a design over which he has had no control. This could result in increased health and safety risks for the CDM 2007 principal contractor as he would have no prior knowledge of the designer-imposed waste management activity required of him (site storage/working areas required for materials recycling or re-use, et cetera) once the construction phase commences, thus having increased risk of environmental damage and/or pollution resulting from his unplanned site-based waste triage activities.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: construction planning; design management; environmental impact; health and safety; recycling
Index terms: design stage, waste management, environmental impact, regulation, placing, design management, landfill, construction waste, construction planning, construction phase, waste reduction, health and safety, pollution, re-use, survey, designer, principal contractor, commitment, recycling
Subjects: environmental health, political science, design process, health safety and environment, concrete and cementitious materials, sustainability assessment, project delivery, construction planning, professional practice, psychology, practitioner, environmental impact, waste management, data collection methods, profession
Topics: Research Practice, Project Management, Construction Materials, Health and Safety, Sustainability, Governance, Roles and Professions, Design Practice, Organizational Design, Site Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here