Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects

Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.

Abstract

This research analyzes over 60,000 awarded highway contracts from 18 states throughout the United States. Analysis was performed on the state and aggregate level. The contracts were awarded from the years 2008 through 2018. Statistical analysis utilizing Pearson's Correlation and Ordinary Least Squares regression for each sample was performed to identify each variables relationship between the budget and awarded values.The research examined effects of economic indicators, contractor descriptors and yearly/seasonal adjustments These variables included DBE Participation Goal, Number of Bidders, Project Dollar Value, Project Duration, Unemployment Rate, S&P 500 Index, Volatility Index, quarter, and year of project award. The results were examined by using a combination of simple statistical summaries and econometric coefficients called a cost vector. Summary statistics observed Bid Difference at 8.5% below the Engineer's Estimate. The study observed DBE Participation Goals averaged 3.74% of the value of contracts, with an observed average of 4.5 bidders per contract. The research determined that 55% of observed states had a positive significant correlation with DBE Participation Goal and Bid Difference. This correlation translated to nearly $80 million in additional cost. In addition, the research determined that all 19 groups in this study had a negative significant correlation with the Number of Bidders. The correlation translated to a savings of nearly $500 million.

Item Type: Thesis (Doctoral)
Thesis advisor: Rapp, R
Uncontrolled Keywords: duration; highway; unemployment; participation; United States; statistical analysis; econometric; economic indicator; construction project
Index terms: estimate, bidder, number of bidders, unemployment, savings, statistics, highway construction, economic indicator, duration, statistical analysis, United States, engineer, construction project, aggregate, econometric
Subjects: Geography, bidding, mathematical modelling, financial and cost management, data analysis and analytics, materials science, civil engineering, production management, data science, economic analysis, project controls, profession
Topics: Procurement, Geographical Context, Business Strategy, Engineering Principles, Time Control, Roles and Professions, Cost Management, Project Management, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here