Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.
Abstract
In Kuwait, there are substantial development plans for the construction industry; however, this is not without obstacles, as it suffers from problems and faces many challenges that have led to poor performance in the industry. This research focuses on the public sector as a sector that could bring innovation to the government and support the aim Kuwait’s vision for 2035 for the construction industry. Moreover, it could help to introduce advanced methods that enable the digitisation of the industry. This study investigates the most common problems facing the Kuwaiti construction industry, identifies an appropriate solution to resolve these issues, and thus, improve the industry. Lean Construction (LC) and Building Information Modelling (BIM) have demonstrated their effectiveness in improving the construction industry in many countries around the world. Lean Construction is a management philosophy to minimise waste and add value for the customer, whereas BIM is a process that manages information through the project lifecycle, from planning and designing through to project completion. Since there is a lack of awareness of Lean Construction and Building Information Modelling in Kuwait, it is essential to consider these two resources when exploring ways to improve the efficiency of the construction industry. Mixed methods research is applied in this study, starting with a survey that explores the challenges and examines the possible solutions applied in construction projects in Kuwait. Subsequently, two case studies are selected to obtain in-depth information on the challenges, project management practices, and adoption of advanced technologies, such as BIM and Lean Construction, in construction projects in Kuwait. Delays, a lack of communication and coordination between stakeholders, poor planning and control, and change in orders by the client have been noted as the main risks in the industry. Yet, public construction organisations can also adopt project management approaches that are ineffective and need improvement. In addition, there is a lack of awareness of Lean Construction, while BIM has been improperly implemented in the industry. In short, the construction industry in Kuwait needs to be developed and modernised to keep pace with other developing countries in terms of its performance and productivity. Therefore, this research will propose the development of a framework based on Lean Construction principles and utilising Building Information Modelling to address the challenges identified in the Kuwaiti construction industry and improve the industry’s performance and effectiveness in terms of time, cost, and quality. The outcome of the study will help to build knowledge for the implementation of BIM using the new International BIM Standard (ISO 19650) with principles of Lean Construction in the construction industry.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | coordination; building information modelling; communication; developing countries; government; innovation; lean construction; lifecycle; productivity; project management practice; public sector; client; stakeholder; Kuwait; case study |
| Index terms: | Kuwait, construction project, face, survey, philosophy, lean construction, ISO, project management practice, developing country, construction industry, implementation, coordination, project management, public construction, effectiveness, lifecycle, productivity, project lifecycle, public sector, efficiency, building information modelling, case study, mixed method |
| Subjects: | project completion, contractual arrangements, psychology, production management, Geography, development economics, building construction, data collection methods, project delivery, standards development, project management theory and practice, management, performance management, administrative law, industry analysis, philosophical studies, information systems |
| Topics: | Procurement, Engineering Principles, Project Management, Geographical Context, Legal Issues, Quality Management, Business Strategy, Research Practice, Site Management, Organizational Design, Digital Applications, International Construction |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here