Application of agile project management in Kuwait oil and gas capital projects

Alyatama, M (2021) Application of agile project management in Kuwait oil and gas capital projects. PhD thesis, University of Northampton, UK.

Abstract

The extreme challenges and substantial volatility associated with oil and gas projects reflect the need for a more flexible, responsive, and adaptable framework than the Traditional Project Management approaches usually found in the sector. This study explores Agile Project Management best practices merged into the existing frameworks within Kuwaiti’s oil and gas sector to create a Hybrid Project Management framework. It also investigates whether project managers understand this hybrid framework's value and believe it can benefit their organisations. This study applies explanatory sequential mixed-methods. The quantitative method surveys agile best practices and Oil and Gas projects' delay of 106 project management professionals. The quantitative method was followed by qualitative in-depth interviews with eight consultants who worked with both Traditional and Agile Project Management. The results suggest six best practices to reduce project delays and address project complexity: Iteration Planning, Retrospective Meetings, Daily Stand-Up Meetings, Communication and Collaboration, Enhancing Team Skills, and Solving Contractual Issues. Project delays are due to contractual problems, communication issues, poor planning and coordination, and a traditional approach. The findings further indicate that the identified best practices can reduce these delays by strengthening their weaknesses. The outcome of this study is a hybrid framework consisting of the proposed agile best practices, that are integrated as part of phase- gate project management. The framework includes the improved clarity and trackability of the waterfall methodology with the flexibility, smooth functioning, and adaptability of the Agile Project Management framework; hence the framework is recommended for Kuwait’s oil and gas sector. Potential implementation challenges are then identified, including project managers who may not possess the experience and expertise to apply the hybrid framework. These are countered with recommendations for the best possible application of the hybrid framework. In the future, the framework will be applied in real case capital projects development.

Item Type: Thesis (Doctoral)
Thesis advisor: Jraisat, L E and O'Kane, J
Uncontrolled Keywords: best practice; collaboration; communication; complexity; coordination; flexibility; skills; consultant; professional; project manager; interview; Kuwait
Index terms: best practice, iteration planning, capital project, implementation, oil and gas, project management, coordination, project manager, Kuwait, methodology, collaboration, adaptability, strengthening, quantitative method, complexity, project delay, project complexity, interview, survey
Subjects: data analysis and analytics, business, profession, data collection methods, control systems, project controls, systems engineering, industry analysis, management, project management theory and practice, strategic project management, contractual arrangements, user focus, research methods, structural engineering, Geography, organizational theory
Topics: Roles and Professions, Research Practice, Business Strategy, Organizational Design, Time Control, Design Practice, Procurement, Project Management, Geographical Context, Engineering Principles
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here