Abstract

Lean Construction, also known as Lean Project Delivery, is defined as respect and relationship-oriented holistic project design and delivery process. Its overarching aim is to maximize value for all stakeholders, simultaneously emphasizing and materializing the customer’s voice through systematic, synergistic, and continuous improvement in all project aspects such as contractual arrangements, design development, construction process design, means and methods selection, supply chain, workflow reliability on the job-site, post-construction operations, and maintenance. Although the Lean philosophy originated in the manufacturing domain, since the 1900s, it has been profusely adopted within the architecture engineering and construction (AEC) industry via Lean Construction methods designed to fit the project-based nature. Such methods have been known and documented to benefit a project, including customer- satisfaction, job-site safety, risk management, sustainability, profitability, quality, and worker productivity. Together with their interrelated components, they encompass the Lean Construction domain. Throughout this time, since its first inception, Lean Construction practitioners have identified numerous barriers that need resolving for successful and sustainable Lean adoption and implementation on their projects. Research focusing on project-level Lean implementations indicated that the key barriers are the project team’s lack of awareness, education, and understanding related to Lean Construction principles and methods. This limitation presents inconsistent and inefficient approaches in planning project-specific Lean implementations. Hence, any form of industry-wide benchmarking becomes difficult for comparing project performance related to Lean implementation. A root-cause analysis using evidence from literature followed by a set of exploratory interviews with Lean Construction experts was performed to understand this issue more deeply. Combined results from literature review and expert interviews revealed that there is a significant opportunity to improve the project team’s knowledge and ability to systematically plan for Lean implementation by providing a structured planning approach and a standard vocabulary related to Lean Construction methods. This study was completed in three stages: process development, process validation, and ontology development and evaluation. In the first stage, a focused literature review of Lean implementation studies was conducted alongside semi-structured interviews with expert Lean practitioners. This combined approach helped determine the key steps and strategies to guide project teams to systematically plan Lean implementation on a project. In addition, such steps and strategies were used to map the baseline Lean implementation planning process. In the second stage, the baseline process was validated using a single in-depth case study, clarifying the associated requirements such as timeline and duration of collaborative sessions, resource commitments, and educational and training needs. In the third stage, information about Lean Construction methods was systematically gathered, organized, and analyzed using an ontological approach. From this approach, several entities were identified as essential categories belonging to the overarching Lean Construction domain. Furthermore, it was derived from expert opinion that although all such categories contribute to Lean implementation, its crux lies in the project team’s ability to select appropriate Lean methods specific to their project. Therefore, a function-based Lean Construction methods ontology was created by honing the Lean methods and associated project functions and using a four-step iterative process comprising requirements specification, knowledge acquisition, conceptualization, and documentation. Finally

Item Type: Thesis (Doctoral)
Thesis advisor: Messner, J I
Uncontrolled Keywords: continuous improvement; duration; education; liability; project team; reliability; sustainability; benchmarking; construction method; documentation; lean construction; manufacturing; productivity; project delivery; risk management; safety; training; stakeholders; project performance; workflow; case study; interview
Index terms: practitioner, validation, evidence, construction process, construction project, benchmarking, workflow, liability, specification, lean construction, interview, construction method, philosophy, ontology, documentation, commitment, literature review, strategy, profitability, knowledge acquisition, project performance, risk management, project delivery, project team, duration, implementation, lean project delivery, design development, case study, project design, training need, satisfaction, planning process, construction operation, productivity, continuous improvement
Subjects: evaluation and assessment methods, practitioner, psychology, contractual arrangements, construction operations, economic analysis, lean construction, educational resources, production management, design process, building construction, liability law, data collection methods, risk assessment, data analysis and analytics, project delivery, education and knowledge transfer, management, performance measurement, contractual condition, professional development, project management theory and practice, project controls, philosophical studies, student development
Topics: Design Practice, Contract Administration, Time Control, Site Management, Organizational Design, Business Strategy, Information Management, Research Practice, Roles and Professions, Legal Issues, Quality Management, Education, Project Management, Risk Management, Procurement
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here